<em>Look</em><em> </em><em>at</em><em> </em><em>the</em><em> </em><em>attached</em><em> </em><em>picture</em>
<em>H</em><em>ope</em><em> </em><em>it</em><em> </em><em>will</em><em> </em><em>help</em><em> </em><em>you</em><em>.</em><em>.</em><em>.</em>
<em>G</em><em>ood</em><em> </em><em>luck</em><em> </em><em>on</em><em> </em><em>your</em><em> </em><em>assignment</em>
<em>~</em><em>p</em><em>r</em><em>a</em><em>g</em><em>y</em><em>a</em>
Answer:
it cost 5.25 because if u divide 31.50 by 6 it gives u that
Let y be the total number of the bike that are produced
let x be the number of hours
equation:
y = 15x
Hey there!
Our function is:
f(x) = 4^x
If we want to have f(3), we simply can plug in 3 to our answer, and evalutate from there:
f(x) = 4^3 =
4*4*4 =
16*4 =
64
We just calculated 4 to the fourth power, which is four times four times four times four. Therefore, 4 of four is equal to 64.
Hope this helps!
Answer:
y=2/1x +5
Step-by-step explanation:
m represents the slope of the line on the graph, m would be 2/1.
b represents the point on the y axis the line interects at, b would be 5.