Answer: usage-rate segmentation
Explanation: Usage-rate segmentation divides a market by the quantity of product bought or consumed. The 80/20 principle holds that 20 percent of all customers generate 80 percent of the demand.
<span>Work Breakdown Structure.</span>
In addition to prototyping, Powder Bed Fusion (PBF) AM processes have lately been more widely used to manufacture end-use parts. These changes lead to necessity of higher requirements to quality of a final product. Optimization of process parameters is one of the ways to achieve desired quality of a part.
In addition to prototyping, Powder Bed Fusion (PBF) AM processes have lately been more widely used to manufacture end-use parts. These changes lead to necessity of higher requirements to quality of a final product.
Optimization of process parameters is one of the ways to achieve desired quality of a part. Finite Element Method (FEM) and machine learning techniques are applied to evaluate and optimize AM process parameters. While FEM requires specific information, Powder Bed Fusion Machine Learning is based on big amounts of data. This paper provides a conceptual framework on combination of mathematical modelling and Machine Learning to avoid these issues.
Learn more about Powder Bed Fusion here
brainly.com/question/28322914
#SPJ4
Answer:
2686
Explanation:
Given that :
Daily demand (D) = 160
Standard deviation (s) = 35
Review period (T) = 5 days
Lead time (L) = 10 days
Number in stock (I) = 30 units
Service probability α = 99%
Quantity to order Q;
Q = D(T + L) + Z*s + √(T + L) - 1
Zscore p(Z < 0.99) = 2.326 = 2.33(Z probability calculator)
Q = 160(5 + 10) + 2.33 * 35 * √(10 + 5) - 30
Q = 160(15) + (2.33 * 35 * 3.8729833) - 30
Q = 2400 + 315.841788115 - 30
Q = 2685.841788115
Q = 2686
Answer:
We give our friend 437.5 dollars
Explanation:
We have to discount from 500 dollar the interest over time, as the 500 is the value our friend will return in 4 weeks ( a month) not the amount received Hence:
nominal x discount rate x time = discount
being rate and time in the same metric
rate is annual so we express time in portion of a year
500 x -1.5 x 1/12 = -62,5
We have to discount 62.5 dollar from the nominal
nominal less discount = present value
500 - 62.5 = 437.5