1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
balandron [24]
3 years ago
13

In a circle, I 90° sector has an area of 36 pi inches squared what is the radius of the circle

Mathematics
2 answers:
WINSTONCH [101]3 years ago
8 0
Im not sure but i think its 6. sorry if its wrong : (
krek1111 [17]3 years ago
4 0

Answer: 12 inches

Step-by-step explanation:

Given: In a circle , the area of a sector = 36 \pi\text{ inches}

Measure of Arc \theta=90^{\circ}

The formula to calculate the area of the sector is given by:-

\text{ Area of sector}=\frac{\theta}{360^{\circ}}\times\pi r^2

Substitute area and angle in the formula, we get

36\pi=\frac{90^{\circ}}{360^{\circ}}\times\pi r^2\\\\\Rightarrow36\pi=\frac{1}{4}\times\pi r^2\\\\\Rightarrow\ r^2=36\times4\\\\\Rightarrow r^2=144\\\\\Rightarrow\ r=12\ \text{ inches}

Hence, the radius of the circle = 12 inches.

You might be interested in
Ginny is studying a population of frogs. She determines that the population is decreasing at an average rate of 3% per year. Whe
Gala2k [10]

Answer:

f(x) = 1,200 * (0.97)ˣ

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
What is the center and radius of the following circle (x - 5) ^ 2 + (y + 2) ^ 2 = 16
murzikaleks [220]

Answer:

Step-by-step explanation:

if center=(h,k)

radius=r

eq. of circle is (x-h)^2+(y-k)^2=r^2

given eq. is (x-5)^2+(y+2)^2=16=4^2

comparing

center =(5,-2)

radius r=4

4 0
3 years ago
cehgg A costing system that first assigns costs to activities and then to products is a.job-order costing. b.activity-based cost
Ronch [10]

Answer:b.activity-based costing.

Step-by-step explanation: Activity-based costing is a costing system that first talkies or identifies the activities that are involved in the Manufacturing or in a particular process and them assigns cost to such activities. This type of costing gives high premium or focus on the activities as it assigns cost to products based on the activities that led to the production of the products.

THIS TYPE OF COSTING IS ALSO KNOWN AS ABC APPROACH TO COSTING IT FIRST ASSIGN RESOURCES TO ACTIVITIES AND FROM ACTIVITIES TO PRODUCTS BASED ON THE CONSUMPTION ESTIMATES.

8 0
3 years ago
One pound of candies costs $3.50. How much will we have to pay for 3 lb?
Romashka-Z-Leto [24]

Answer: 10.50 dollars


Step-by-step explanation:

3.50 x 3 = 10.50

8 0
3 years ago
C= 6x+100 and c=10x+80 <br> what number does x have to be for c to be the same on each equation?
slega [8]

Answer:

x= 5 , for c to be same on each eqn

7 0
2 years ago
Other questions:
  • ALGEBRA 2 HELP PLEASE ​
    5·1 answer
  • Help w/math problem please!!! :)
    11·1 answer
  • Square root of 48a^5 *b over square root of 12ab. Simplified
    12·1 answer
  • 1. The sign outside Mrs. Washington’s catering company is in the shape of a trapezoid, as shown below.
    6·2 answers
  • the area of a rectangle with 16 square units. Use the grid to draw that the rectangle look like. Then shade the area. What are i
    6·1 answer
  • What are the factors of x2 − 64?
    15·1 answer
  • If a case holds 12 items how many cases would you need to transport 159 items
    13·2 answers
  • Jan walks 40 meters in 15 seconds what is her rate?
    11·1 answer
  • The sum of 2 numbers is 28. One number is 5 less than twice the other number. What are the numbers?
    13·1 answer
  • Write an equation of the line.(slope intercept form)
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!