The time to assemble the first unit on a production line is 8 hours. The learning rate is 0.81. Approximately how long will it t
ake for the seventh unit to be assembled?
1 answer:
Answer:
4.428 hours
Step-by-step explanation:
If the learning rate is 0.81, the slope of the learning curve is:

The time it takes to produce the n-th unit is:

If T1 = 8 hours, the time required to produce the seventh unit will be:

It will take roughly 4.428 hours.