Answer:
The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.
Step-by-step explanation:
Answer:
x=3
Step-by-step explanation:
lets take x as the number
so
6(x-3)=x-3
since it says "6 times" we know that we will have to multiply the difference by 6 and it says the difference of a number and 3 is equal to 3 less than the number so we know that we are subtracting 3 from x
6x-18=x-3
6x-x=18-3
5x=15
x=3
Initially, Ball A of 10 kg will have velocity x, while Ball B of 30 kg has velocity -10 m/s.
After collision, Ball A will have a velocity of -30 m/s, while Ball B will have velocity 10 m/s. We assume their masses do not change.
(10 kg)(x m/s) + (30 kg)(-10 m/s) = (10 kg)(-30 m/s) + (30 kg)(10 m/s)
10x - 300 = -300 + 300
x = 30 m/s (to the right)