Answer:
An article explaining your ideas on how to best rescue endangered loggerhead turtle eggs
Step-by-step explanation:
In the problem and solution organization pattern, it is all about the ability to determine the problems affecting the organisation as well as proffer solutions on how to solve those problems. This would then lead to minimizing cost and maximizing profits. <em>The example above which is about ideas on how to rescue endangered loggerhead turtle eggs is following same pattern.</em>
A.) R(20) = -10(20)^2 + 800(20) = -10(400) + 16000 = -4000 + 16000 = $12,000
R(25) = -10(25)^2 + 800(25) = -10(625) + 20000 = -6250 + 20000 = $13,750
R(30) = -10(30)^2 + 800(30) = -10(900) + 24000 = -9000 + 24000 = $15,000
b.) For maximum revenue, dR/dp = 0
dR/dp = -20p + 800 = 0
20p = 800
p = 40
Therefore, the maximum revenue will be recorded when the price is set at $40.
Answer: .
Step-by-step explanation:
It is given that Point A is at (-5, -4) and point B at (-3, 3).
We need to find the coordinates of the point which is 3/4 of the way from A to B.
Let the required point be P.
It means, point P divides segment AB in 3:1.
Section formula: If a point divides a line segment in m:n, then
Using section formula, we get
Therefore, the required point is .