So 60 + 20 is 80, and that is $80 a mile. 80 x 3 = 240, + 80 = 320. and then we could say 2/6 of 80 is about 28, right? so i suppose 4 2/6? sorry if it's wrong, just trying to help to the best of my ability
quadratic equations can be soled by 3 methods
factorization
completing square
quadratic formula
but factorization is the simplest
Answer:
ok
Step-by-step explanation:
Answer:
These correspond to two types of cost: fixed cost and variable cost. Fixed cost (FC): the cost of all fixed inputs in a production process. Another way of saying this: production costs that do not change with the quantity of output produced. Variable cost (VC): the cost of all variable inputs in a production process.
Given that the score of the student on the quiz was 25c - 10(15 - c)
It can be seen that the first term of expression for her score (i.e. 25c) shows that 25 marks were awarded to each correct answer.
The second term of the expression (i.e. 10(15 - c)) represent that 10 marks were deducted from each wrong answer.
Thus, the number of wrong answers is 15 - c.
The sum of the correct answers and the wrong answers gives the total number of questions in the quiz.
Thus, the total number of questions in the quiz is given by 15 - c + c = 15.
Therefore, there are 15 questions in the quiz.