She has no more white ribbon because she exchanged it for yellow.
Answer:
Answer is 0.5
Step-by-step explanation:
The text implies that the number of traffic accidents determines the number of ambulances required on the road. Hence, 1 traffic accident requires 1 ambulance.
The time slot and time of day remain same in both the text and the question.
The average or mean number of accidents is 1.1
QUESTION: What then is the probability that there is need for exactly 2 ambulances on that road and in that time frame?
In other words, what is the probability that there'll be 2 accidents on that road and in that time frame?
Since the mean number of accidents is 1.1, 2 is above the mean.
Probability of 1.1 accidents is 1, since that's the mean (expected value).
Probability of 2 accidents is 1/2 which is = 0.5
Answer:
X is four times less/smaller than Y or Y is four times greater than X
Step-by-step explanation:
Not sure what you are asking to do
Answer:
Step-by-step explanation:
The graph is done using Desmos. Just by substitution x = 1 will force the graph to go to y = 0, but graphs are not always that good. This one gets 1.111
to get y = 0. I'd use 1 if you had to answer it and a computer will mark it.
Answer:
Height of the brick portion of the wall is 5.61 feet.
Step-by-step explanation:
Employees of the landscaping company used brick to build the top 2/3 of the wall. The total dimensions of the wall are 8 and 1/2 * 2 and 3/4 feet. So the height of the wall = 8 and 1/2 feet or in other words 8.75 feet.
Height of the brick portion of the wall = 2/3 * 8.5 = 0.66 * 8.5 = 5.61 feet
So the height of the brick portion of the wall is 5.61 feet.
Non brick portion of the wall is 8.5 - 5.61 = 2.89