Answer:
A
Explanation:
B is a print statement.
C is a function invocation
D is a function declaration
A prototype is actually quite close to a declaration. The semi-colon at the end shows that no implementation will follow. Adding parameter names is allowed but would only be helpful for better understanding.
Answer:
5.23 LAB: Adjust values in a list by normalizing When analyzing data sets, such as data for human heights or for human weights, a common step is to adjust the data. This can be done by normalizing to values between 0 and 1, or throwing away outliers.
Explanation:
Since Wi-Fi Protected Access (WPA) fixes critical vulnerabilities in the earlier wired equivalent privacy (WEP) standard, the attacks that is related to encrypted wireless packets is option A: IV attacks.
<h3>Describe an IV attack.</h3>
A wireless network attack is called an initialization vector (IV) attack. During transmission, it alters the IV of an encrypted wireless packet. One packet's plaintext can be utilized by an attacker to calculate the RC4 key stream produced by the IV employed.
Note that A binary vector used to initialize the encryption process for a plaintext block sequence in order to boost security by adding more cryptographic variance and to synchronize cryptographic hardware. The initialization vector is not required to be kept secret.
Learn more about Wi-Fi Protected Access from
brainly.com/question/13068630
#SPJ1
See full question below
Wi-Fi Protected Access (WPA) fixes critical vulnerabilities in the earlier wired equivalent privacy (WEP) standard. Understanding that WPA uses a combination of an RC4 stream cipher and Temporal Key Integrity Protocol (TKIP), this makes a wireless access point NOT vulnerable to which of the following attacks when related to encrypted wireless packets?
IV attacks
Malware
Ransoware
Answer:
There are multiple critical paths
Explanation:
The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.
The essential technique for using CPM is to construct a model of the project that includes the following:
- A list of all activities required to complete the project (typically categorized within a work breakdown structure),
- The time (duration) that each activity will take to complete,
- The dependencies between the activities and,
- Logical end points such as milestones or deliverable items.
Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).
considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.