For this case what you must do is add the number of hours to perform the different activities.
We have then:
14 person-hours of labor to break up to driveway and clear away the rubble.
8 person-hours of labor to pour and smooth concrete for the new driveway.
Adding both activities we have
14 + 8 = 22
answer
it takes to break up to driveway, clear away the rubble, pour the concrete, and smooth the concrete about 22 person-hours of labor
Answer:
it would take 63 weeks to save that much money
Step-by-step explanation:
divide 25 by 9 and get 2.7 then multiply 2.7 by 63 to get 175
Getting a 5 = 1/6
Getting tails = 1/2
1/6 * 1/2 = 1/12
Answer:
Step-by-step explanation: i cant help if you dont give the question:)

★ ∆ ABC is similar to ∆DEF
★ Area of triangle ABC = 64cm²
★ Area of triangle DEF = 121cm²
★ Side EF = 15.4 cm

★ Side BC

Since, ∆ ABC is similar to ∆DEF
[ Whenever two traingles are similar, the ratio of the areas of two similar triangles is equal to the square of the ratio of their corresponding sides. ]

❍ <u>Putting the</u><u> values</u>, [Given by the question]
• Area of triangle ABC = 64cm²
• Area of triangle DEF = 121cm²
• Side EF = 15.4 cm

❍ <u>By solving we get,</u>






<u>Hence, BC = 11.2 cm.</u>

★ Figure in attachment.
