Answer:
the project cash flow is $92,880
Explanation:
The computation of the project cash flow for the change in net working capital in the year 1 is shown below:
Working capital needed for the year 1 $55,000 ($550,000 × 10%)
Add: Additional inventory $48,000
Add: Increase in account receivable $11,880 ($297,000 × 4%)
Less: Increase in accounts payable $22,000
Project cash flow $92,880
Hence, the project cash flow is $92,880
<span>The level of maintenance that involves preventive and corrective procedures which are intended to restore equipment to a mission-capable status is the D - level maintenance. The FRC is a place whereby these kind of maintenance is being held. They are the ones who ensure that the transportation vehicle is still capable to operate such as checking their operation systems, maintenance, improvement and sampling.
</span>
Answer:
This statement is describing demand pull inflation.
Explanation:
If the aggregate demand increases the demand curve will shift rightwards. But if the increase in demand is higher than increase in supply this will lead to an increase in the price level. The output level will increase but constant increase in price will cause inflationary pressures. This is referred toa as demand-side inflation.
Answer:
Return on assets = 10.87 %
Return on assets = 11.42%
Return on assets = 12.51 %
Explanation:
given data
arithmetic average return = 13.60 percent = 0.1360
geometric return = 10.44 percent = 0.1044
observation period N = 30 years
solution
we will use here Blume formula for return of the asset for 5 , 10 and 20 year
Return on assets = Arithmetic average return × (N - T) ÷ (N - 1) + Geometric average × (T - 1) ÷ (N - 1) ....................1
here N is observation period and t is time period i.e 5, 10 and 20
put here value for all 3 we get
Return on assets =
Return on assets = 0.108759 = 10.87 %
and
Return on assets = 
Return on assets = 0.114207 = 11.42%
and
Return on assets = 
Return on assets = 0.125103 = 12.51 %