Answer:
Renters insurance only covers personal belongings, whereas homeowners insurance covers personal belongings and the entire home or the property homeowners insurance covers everything
Answer:
Cash flow from operations will increase by $2,200.
Explanation:
The amount of increase in cash flow from operations can be calculated as follows:
Increase in cash flow from operations = Sales - Increase in accounts receivable + Increase in accounts payable …………… (1)
Sales = $2,500
Increase in accounts receivable = $800
Increase in accounts payable = $500
Substituting the values into equation (1), we have:
Increase in cash flow from operations = $2,500 - $800 + $500 = $2,200
Therefore, cash flow from operations will increase by $2,200.
Answer:
(a) What is the cost per square foot of the 2000 ft lodge?
- construction cost per sq foot = $150,000 / 2,000 = $75 per square foot
(b) If you arc also considering a. 4000 ft layout option, estimate your construction costs if: i. All cost items (in the table) change proportionately to the size increase.
- total construction costs for a 4,000 sq ft layout = $150,000 x 2 = $300,000 since all costs vary proportionally to the size of the cabin
ii. The first two cost items do not change at all: all others are proportionate.
- total construction costs = (23% x $150,000) + (77% x $300,000) = $34,500 + $231,000 = $265,500
The answer is: 18%
Approximately, the total amount of medical cost that the government had to cover is around 2.9 Trillion Dollars every years.
Since the Gross Domestic product of united states is approximately around 16.1 Trillion dollars every year, the percentage of the medical cost is:
2.9/16.1 x 100 = 18.01% from total GDP
Answer:
Effectiveness = 0.75
Explanation:
Availability time for a each day = 10 hr = 600 minutes
Total time for fabricating is given as 90 minutes'
Total time to set up one part 10 minutes
Total parts made in each single day 5
Percentage of defective part 10%
Total production time for a single part = setup time + fabricated time
= 10+ 90 = 100 min
Production time for 5 part =5 × 100 = 500 minutes
Total number of defective parts = 10% of 5 = 0.5 parts
Time to replaced defective = 0.5 × 100 = 50 min
Value added time = 500 - 50 = 450 min
Effectiveness is given as
Effectiveness
Effectiveness