Step-by-step explanation:
the answer is in the image above
Answer:
A
Step-by-step explanation:
Mean = 12000
Standard Deviation = 2000
We have to find how many standard deviations is 14,500 away from the mean.
This can be achieved by calculating the z-score
Z-score tells us how many standard deviations above or below is a sample value from the mean. A positive z value shows, sample value is above the mean.
z score can be calculated as = (Sample Value - Mean )/Standard Deviation)
So,
Z-score =
This means, 14,500 is 1.25 standard deviations above the mean value 12,000.
Answer:
a.2s b.43.6m
Step-by-step explanation:
h(t)=−4.9t2+19.6t+24
24m = inittial possition
-4.9 t2= -1/2 g t2
19.6t= Vo t
as the initial velocity is positive, the ball is thrown up.
the maximum height of the ball is reached when the velocity is 0
V= Vo-gt=19.6m/s-9.8m/s2 t=0
t=19.6/9.8=2s
<u>it takes 2seconds for the ball to reach its maximum height</u>
h(t)=−4.9t2+19.6t+24
h(2)=-19.6m+39.2m+24=43.6m
<u>the maximum height of the ball is 43.6m</u>
Answer:
y=2x+3
A parallel line is only supposed to have an oposite slope.