Answer: The awnser is 16 weeks
Step-by-step explanation: this is the awnser because 12.50 x 16 is $200 and if does 17 weeks it will be $212.50
X equals 6
How? Well first I multiplied 12 x 18 which is 216.
Then I subtracted 468 - 216 that equals 252.
Because I know that 2 x 6 equals a 12.....x had to be a 6.
So I multiplied 42 x 6 and it equaled 252.
So x is 6
Answer:
-37.5 m
Step-by-step explanation:
If we assume that "one full day" is 24 hours, then 15 hours represents the fraction 15/24 of a day. Since the drilling rate was constant, and was presumed to start from a height of 0, the height after 15 hours is that fraction of the day's work:
... (15/24)×(-60 m) = -37.5 m
Answer:
Y <= 1
Step-by-step explanation:
This is because it is a solid line and a filled point on the top line, the bottom line is irrelevant for this question