A construction company can remove 5 1/4 metric tons of dirt from a construction site in 4 1/2 hours. What is the unit rate in me tric tons per hour.
2 answers:
ANSWER
Find out the what is the unit rate in metric tons per hour.
To prove
Unit Rate is the ratio of two measurements in which the second term is unit .
i.e here used for 1 hour.
As given
A construction company can remove metric tons of dirt from a construction site in hours.
A construction company can remove metric tons of dirt from a construction site in hours.
Now
The unit rate in metric tons per hour is 1.17 metric tons(approx).
Answer:
Unit rate in metric tons per hour = 1.17
Explanation:
A construction company can remove 5 1/4 metric tons of dirt from a construction site in 4 1/2 hours.
Dirt removed
Time taken in hours
Unit rate in metric tons per hour = Dirt removed in metric tons/ Time taken in hours for that.
Unit rate in metric tons per hour
You might be interested in
Mrs.Byrne make 13/16 piece 29
Answer:
1,048,576
Step-by-step explanation:
You should multiply it with -2 20 times
4 times 6 is equal to 24 so I did the same to 5 ( because 4/5) and then I got 30 so. In six years he will be 24 and his brother will be 30 but in 4 years his brother Nick will be 28.
Answer:
bro i got you
answer: x=7
Step-by-step explanation:
3x = 4x-9
subtract 4x from each side
-x=-9
x=9
enjoy bro get that good grade
Answer:
C, you can use rotations to describe a change in the position of a figure.