Answer: 7 7/8 hours long
Step-by-step explanation:
April worked 1 1/2 times as long as Carl did. 1 1/2 can be rewritten as 3/2. Number of Hours April worked on math project 3/2 times the Number of Hours Carl worked on Math project. Which Carl worked 5 1/4 hours long, which can be rewritten as 21/4
Answer:
1) X = 10 Therefore, 10 + 2 + 10 = 22.
2) B = 2 Therefore, 15 = 8(2) - 5 + 2(2)
3) B = -0.9 Therefore, -10 + 4(3(-0.9) + 10) = 19.
Answer:
Step-by-step explanation:
The right statistical procedure is by applying a hypothesis test that uses a single mean. Here, if we are to talk about comparison, it should be between the mean IQ of the students in the class and the national average IQ. The class is not for a comparison between two population means because it is viewed as the sample of the population. That is to say, the required task is to determine if the sample mean is greater than the population mean. We can conclude that this obeys a hypothesis test rather than a confidence interval.
Answer:
1: B
Step-by-step explanation:
Answer:
m<2 = 73
Step-by-step explanation:
Since <1 and <2 are complementary (which means that they equal 90), all you have to do is subtract 17 from 90 to find your answer:
90 - 17 = 73
thus, m<2 = 73