Answer: D
Step-by-step explanation: slope = "rise over run" = 1.5/18 = 3/36 = 1/12 for the 1st section to the landing
slope is the change in height, the vertical change, divided by the change in horizontal distance
2nd section has slope 1/18 and covers 9 feet. That means it rises 1/2 foot
slope = 1/18 = (1/2)/9
the door is 2 feet higher than the ground level, 1.5 + .5 = 2 feet change vertically
So the -4x is the M and then 6 is the B. So m is the slope and B is the y-intercept. The 6 goes on the y axis and the -4 will be how the line looks. It’ll be rise (-4) over run (1).
Answer:
The minimum score required for the job offer is 751.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:

What is the minimum score required for the job offer?
Top 14%, so the minimum score is the 100-14 = 86th percentile, which is X when Z has a pvalue of 0.86. So X when Z = 1.08.
Then




Rounding to the nearest whole number:
The minimum score required for the job offer is 751.