Answer:
3 hours 5 minutes
Step-by-step explanation:
Had he skied 5 minute longer, he would have skied for 4 hours, leaving 3 hours for snowboarding. Since he skied 5 minutes less than 4 hours, he snowboarded 5 minutes more than 3 hours.
You can also just subtract the times.
7 hours - 3 hours 55 minutes =
= 6 hours 60 minutes - 3 hours 55 minutes
= 3 hours 5 minutes
Answer: 3 hours 5 minutes
Answer:
k=1/4
Step-by-step explanation:
1/4x1=1/4
0x1/4=0
-1x1/4=-1/4
-2x1/4=-1/2
Very easy
It is a function. It passes the vertical line test, meaning for each x there's at most one y.
When x=2 we see y=-3 as (2,-3) is a point on the graph
Answer: 2
Step-by-step explanation:
Multiply by 2 each side and the result will give the numbers of the larger triangle.
Answer:
A reflection over the x-axis
Step-by-step explanation:
The X-axis is the horizontal line, and if G is the result of F, then figure F going up or down 6 units would make it uneven and it wouldn't look flipped.