A. Asset
Explanation:
-asset is a useful or valuable thing
Answer:
KTM 350 full-size 450s, the 350 remains the bike for the common man. The KTM 350, along with its blood brother the Husqvarna FC350, appeals to the rank-and-file rider who doesn’t want to deal with 60 horsepower. The 350s have steadily improved over their lifespan and are currently better than ever.
Explanation:
Answer:
True
Explanation:
Given that a bottleneck is a term often used in business or any operational situation to describe the situation whereby there is overcrowding at a particular point in time of operation.
And to elevate bottleneck means to solve the issue of bottleneck by making it a priority. This can be done in many ways, one of which is to improve the workspace or make arrangements for additional space or machines.
Hence, it is TRUE that A business school with plenty of classroom space that hires adjunct faculty for a semester to meet unusually high student demand for courses is an example of elevating a bottleneck.
We
should note that the bond investment account is recorded at cost by the Bondholder
or Investor.
The
cost or price is calculated as:
Cost
= $90,000 * 86.4%
Cost
= $90,000 * 0.864 = $77,760
Therefore,
the entry to record should be:
<span>debit
Held-to-Maturity Investment in Bonds for $77,760 and credit Cash for $77,760</span>
Answer:
The correct answer is B.
Explanation:
Giving the following information:
The variable costs are $4.50 per unit. London Plastics sell 15,000 units.
To calculate the total variable costs we need to use the following formula:
Total variable cost= unitary variable cost* total amount of units
Total variable cost= 4.5*15,000= $67,500