Answer:
10=7
Step-by-step explanation:
6+4=10
2x5=10
10-3=7
Hope this helps :)
Answer: Red copper = $0.12 per meter
Yellow copper = $0.22 per meter
Step-by-step explanation:
Since Red copper costs $0.90 for 7.6m, the cost of 1m of red copper will be:
= $0.90/7.6
= $0.12
Since yellow copper costs $1.12 5.2m, the cost of 1m of yellow copper will be:
= $1.12 / 5.2
= $0.22 per meter
Answer:
1 : 900
Step-by-step explanation:
18 m = 1800 cm
2:1800 reduced is 1:900
I tired I don’t know if it’s correct