Check the attached file for the answer.
Answer:
The volume of the gas is 
Step-by-step explanation:
we know that
A relationship between two variables, x, and y, represent an inverse variation if it can be expressed in the form
or 
Let
v------> the volume of a gas in cubic centimeters
p-----> the pressure of the gas in liters per square centimeters
so

we have

substitute and solve for k

The equation is 
<em>Find the volume of the gas when the pressure is 2.2 L/cm2</em>
so
For
Find the value of v
substitute in the equation


Answer:
-8 < x < inf
[-8 , inf )
Step-by-step explanation:
set up a +/- |x + 8| = x + 8
the setup a number line and use test points
The answer is (7, -26) for The second endpoint.
We'll call the midpoint M. In order to find this, we must first note that to find a midpoint we need to take the average of the endpoints. To do this we add them together and then divide by 2. So, using that, we can write a formula and solve for each part of the k coordinates. We'll start with just x values.
(Ux + Vx)/2 = Mx
(Vx + 3)/2 = 5
Vx + 3 = 10
Vx = 7
And now we do the same thing for y values
(Uy + Vy)/2 = My
(Vy + 6)/2 = -10
Vy + 6 = -20
Vy = -26
This gives us the final point of (7, -26)
Answer:
<em>The answer resides in the explanation.</em>
<em>Pls rate as brainliest </em>
Step-by-step explanation:
The predicted useful life of a brand A cutting tool when the speed is 45 meters per minute is 1.2 to 5.5 hours.
The predicted useful life of a brand B cutting tool when the speed is 45 meters per minute is 3.4 to 5.4 hours.
The prediction interval for brand A is larger than the prediction interval for brand B because the estimated standard error of y^ is different for the two intervals.
The prediction intervals are both larger than the corresponding confidence intervals.
The standard error for the estimated mean value of y is smaller than the standard error for the predicted value of y.
The predicted useful life of a brand A cutting tool that is operated at 100 meters per minute is -0.59 hours
The actual predicted useful life of a brand A cutting tool when the speed is 100 meters per minute is 0.0 to 2.3 hours.