8

Sweeten Company had no jobs in progress at the beginning of March and no beginning inventories. The company has two manufacturin

g departments--Molding and Fabrication. It started, completed, and sold only two jobs during March - Job P and Job Q. The following additional information is available for the company as a whole and for Jobs P and Q (all data and questions relate to the month of March):
Molding Fabrication Total
Estimated total machine-hours used 2,500 1,500 4,000
Estimated total fixed manufacturing overhead $ 13,000 $ 16,800 $ 29,800
Estimated variable manufacturing overhead per machine-hour $ 2.60 $ 3.40
Job P Job Q
Direct materials $ 25,000 $ 14,000
Direct labor cost $ 30,600 $ 12,300
Actual machine-hours used:
Molding 2,900 2,000
Fabrication 1,800 2,100
Total 4,700 4,100
Sweeten Company had no underapplied or overapplied manufacturing overhead costs during the month.
Required:
For questions 1-8, assume that Sweeten Company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. For questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments.

1. What was the company’s plantwide predetermined overhead rate?
2. How much manufacturing overhead was applied to Job P and how much was applied to Job Q?
3. What was the total manufacturing cost assigned to Job P?
4. If Job P included 20 units, what was its unit product cost?
5. What was the total manufacturing cost assigned to Job Q?
6. If Job Q included 30 units, what was its unit product cost?
7. Assume that Sweeten Company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling for all of its jobs. What selling price would company have established for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis?
8. What was Sweeten Company’s cost of goods sold for March?
9. What were the company’s predetermined overhead rates in the Molding Department and the Fabrication Department?
10. How much manufacturing overhead was applied from the Molding Department to Job P and how much was applied to Job Q?
11. How much manufacturing overhead was applied from the Fabrication Department to Job P and how much was applied to Job Q?
12. If Job P included 20 units, what was its unit product cost?
13. If Job Q included 30 units, what was its unit product cost?
14. Assume that Sweeten Company used cost-plus pricing (and a markup percentage of 80% of total manufacturing cost) to establish selling prices for all of its jobs. What selling price would the company have established for Jobs P and Q? What are the selling prices for both jobs when stated on a per unit basis?
15. What was Sweeten Company’s cost of goods sold for March?
Business
2 answers:
zlopas [31]3 years ago
8 0

1.Plant wide predetermined rate= \frac{Total Fixed Manufacturing Overheads}{Total Estimated Hours}

Plant Wide Predetermined rate=\frac{29800}{4000}

Plant Wise Predetermined Rate=$7.45

2. Manufacturing Overheads Applied to P and Q

                                                                                                 P                           Q

Variable Manufacturing Overheads                          

Molding                                                                            7540                      5200

Fabrication                                                                      6120                        7140

Fixed Manufacturing Overheads

Molding                                                                           21605                     14900

Fabrication                                                                      13410                      15645


Total                                                                             48675                      42885

3. Total Manufacturing Cost assigned to Job P is $48675.

4. If P has 20 Units Unit Product Cost will be as below:

    Direct Materials                                                                         25000

    Direct Labour                                                                            30600

    Total Manufacturing overheads assigned                              48675

    total Product Cost                                                                   104275

    Cost per unit                                                                           $5213.75  

5. Total Manufacturing Cost Assigned to Job Q is $42885.

6. If Q has 30 units uint product cost will be as below:

   Direct Materials                                                                      14000

   Direct Labour                                                                           12300

  Total Manufacturing Overheads                                             42885

  Total Cost                                                                                 69185

  Cost per Unit                                                                         $2306.16

7. Selling Price for P

   Total Cost of P...............................................................................$104275

   Mark Up...........................................................................................$38940

   Selling Price......................................................................................$ 143215

  Cost per unit.....................................................................................$7160.75

 Selling Price for Q

 Total Cost of Q ..............................................................................69185

 Markup .........................................................................................   34308

Selling Price  ................................................................................103493

Cost per unit...................................................................................$3449.76

8. Cost of Goods Sold for March...................................................$173460




cluponka [151]3 years ago
3 0

Answer:

1. Plant wide predetermined rate= Total fixed manufacturing overhead/Total estimated hours

Plant Wide Predetermined rate= 29800/4000

Plant Wise Predetermined Rate=$7.45  

2. Assembling Overheads Applied to P and Q  

P                                                                     Q  

Variable Manufacturing Overheads  

Embellishment                                    7540    5200  

Manufacture                                     6120    7140  

Fixed Manufacturing Overheads  

Trim                                                 21605   14900  

Manufacture                                     13410    15645  

All out                                                 48675    42885  

3. All out Manufacturing Cost doled out to Job P is $48675.  

4. In the event that P has 20 Units Unit Product Cost will be as beneath:  

Direct Materials       25000  

Direct Labor       30600  

Absolute Manufacturing overheads allocated    48675  

Absolute Product Cost       104275  

Cost per unit       $5213.75  

5. Absolute Manufacturing Cost Assigned to Job Q is $42885.  

6. In the event that Q has 30 units unit item cost will be as underneath:  

Direct Materials        14000  

Direct Labor       12300  

Absolute Manufacturing Overheads     42885  

Absolute Cost       69185  

Cost per Unit       $2306.16  

7. Selling Price for P  

Absolute Cost of P...............................................................................$104275  

Imprint Up...........................................................................................$38940  

Selling Price......................................................................................$ 143215  

Cost per unit.....................................................................................$7160.75  

Selling Price for Q  

Absolute Cost of Q ..............................................................................69185  

Markup ......................................................................................... 34308  

Selling Price  ................................................................................103493  

Cost per unit...................................................................................$3449.76  

8. Cost of Goods Sold for March...................................................$173460

Answer details:

Subject: Business

Level: High school

Keywords:

• Absolute cost  

• Selling price

• Cost per unit

• Markup

• Fixed manufacturing overhead

Learn more to evaluate:

brainly.com/question/4997492

brainly.com/question/4010464

brainly.com/question/1754173

You might be interested in
Listed below are the lengths (in inches) of each snake in the Clarmont Zoo’s reptile house
Elanso [62]
The mode is 50 the most frequent
6 0
3 years ago
The federal funds rate is the interest rate that banks charge one another for short-term (typically overnight) loans. When the F
WARRIOR [948]

Answer: decreases

                                                                         

Explanation: The following practice is done by the central bank in the situation of inflation when there is an excess supply of money in the economy.

The central bank tries to decrease the funds by selling the govt bonds to the banks. This results in decrease in funds from banks as they have to buy such bonds from their respective funds.

6 0
3 years ago
Fill in the blank: Using a(n) _____ keeps a record of any inconsistencies from the initial requirements of a project.
MariettaO [177]

An issue log is simply known as a type of documentation element of software project management Using an issue log keeps a record of any inconsistencies from the initial requirements of a project.

  • The issue log is known to have a list of ongoing and closed issues concerning project.

This type of logs can be seen as a way to track errors in any project.

It consist of name of the person who solve the problem, the date or time of the issue, the issue's priority and status and the date or time that the problem was resolved.

An issue log is also regarded as a simple list or spreadsheet that managers use to monitor the issues that arise in a project.

Learn more from

brainly.com/question/14869466

5 0
3 years ago
How is goodwill calculated? A. The amount paid to purchase a business in excess of the market value of its net assets. B. An est
kondaur [170]

Answer:

Goodwill is calculated as A. The amount paid to purchase a business in excess of the market value of its net assets.

Explanation:

Goodwill is the quantification of the value of the name or reputation of a business. It is an intangible asset for the business that arises and is recorded as part of a business's value when it is sold. Goodwill is the additional amount paid by the buyer in excess of the amount that a business's tangible net assets are worth. Thus, goodwill can be calculated as the amount paid in to purchase a business in excess of the market value of its net assets.

For example, If a business is purchased for $100 whose net assets, which are Total assets less total liabilities, are worth $80. Then the goodwill is the $20 that is the difference of the amount paid to purchase the business and the value of its net assets.

8 0
3 years ago
Hyu Corporation bases its predetermined overhead rate on the estimated labor-hours for the upcoming year. At the beginning of th
Free_Kalibri [48]

Answer:

The predetermined overhead rate for the recently completed year was $25.33

Explanation:

The formula to compute the predetermined overhead rate is shown below:

Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor-hours)

where,

Total estimated manufacturing overhead = Estimated total fixed manufacturing overhead + estimated variable manufacturing overhead rate × estimated labor hours

= $1,230,440 + $3.12 × 55,400 hours

= $1,230,440 + $172,848

= $1,403,288

Now put these values to the above formula  

So, the rate would equal to

= $1,403,288 ÷ 55,400 hours

= $25.33

8 0
3 years ago
Other questions:
  • What traits and behaviors should an ethical saleperson possess
    6·1 answer
  • Testing conclusions review the typical benefits of physical capital described in section 1. give specific examples of how the fi
    14·1 answer
  • Balance of trade summarizes
    11·2 answers
  • A multiple-channel queuing system with a Poisson arrival rate and exponential service time has an average arrival rate of four c
    7·1 answer
  • After considering current market conditions, an investor decides to place 60% of her funds in equities and the rest in bonds. Th
    13·1 answer
  • In the context of key economic considerations when entering a foreign market, the transportation infrastructure in a country mos
    11·1 answer
  • Which strategy are you using when you only read the title section headings and captions?
    14·2 answers
  • 27.Your bank offers to lend you $100,000 at an 8.5% annual interest rate to start your new business. The terms require you to am
    5·1 answer
  • Sunland Company thinks machine hours is the best activity base for its manufacturing overhead. The estimate of annual overhead c
    6·1 answer
  • Cannibalization occurs when a producer offers a new product that takes sales away from its existing products
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!