1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Jobisdone [24]
3 years ago
9

There are 100 lettered tiles in a board game. You chose the following tiles without looking: D, G, K, A, I.

Mathematics
2 answers:
SashulF [63]3 years ago
8 0
40 tiles

Assuming the vowels and non-vowels are equal to the five picked, there would be 40 tiles that are vowels.

You have picked five different letters. 5% or 1/20 of 100. If two of those five were vowels, then if you consistently pick 2/5 vowels every time, a predicted 40 tiles will be vowels, 60 would not.
Mumz [18]3 years ago
4 0

Answer:

Out of 100 tiles we would expect vowel tiles to be:

40

Step-by-step explanation:

Out of the five tiles drawn 2 were vowels

Hence, ratio of vowels to total tiles drawn=2/5

Hence, most likely the ratio of vowels to total tiles will be 2/5

Hence, out of 100 tiles the possibility of vowel tiles are:

\dfrac{2}{5}\times 100

=40

Hence, out of 100 tiles we would expect vowel tiles to be:

40

You might be interested in
If the value of x is 3, then what is the value of 2-8x+4x+4
Veronika [31]
Hey there,
2 - 8x + 4x + 4
2 - 8(3) + 4(3) + 4
2 - 24 + 12 + 4
-6

Hope this helps :))

<em>~Top♥</em>
5 0
3 years ago
Simplify by combining like terms.<br> -3r - 2r - 6 - 1 - 7r+ 9r
zysi [14]

Answer:−3r−7

Step-by-step explanation:

I got it of the web.

4 0
3 years ago
An externally imposed project completion time sets the project duration at 75 days. The critical path of the project is establis
Katen [24]

Answer:

3 days

Step-by-step explanation:

This can be seen under Schedule management (Initiating)

Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because

Externally imposed project date = 75 days

Estimated duration of project = 75 days

Hence, a difference in these will be 0

However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration) .

Hence the maximum float in this case will be 0 + 3 = 3 days

8 0
4 years ago
Find the measure of an exterior angle of a regular polygon with 9 sides
Contact [7]

Answer: 40°

Step-by-step explanation: The formula for calculating the size of an exterior angle is: exterior angle of a polygon = 360 ÷ number of sides. So it's 360°÷9=40°

3 0
3 years ago
Milena's take-home pay is $1200 a month. She spends 12% of her take-home pay on her cable bill. How much is Milena's monthly cab
inna [77]
$1200 - 12% =  $144

1200 - 144 = $1056

12% = 1056
3 0
4 years ago
Read 2 more answers
Other questions:
  • Ravi pays $43.75 for 5 movie tickets.
    10·1 answer
  • At Best Burgers, Jack collected sales data on the type of side order served with each type of burger purchased for a week. Jack
    8·2 answers
  • 5/4 is 1.25 written in what form
    14·2 answers
  • Which table represents a linear function?
    13·1 answer
  • Nicholas’s school is located at ____.
    10·1 answer
  • The following are the initial pressure and volume for a gas in a flexible container:
    5·1 answer
  • The 20% tip on<br> a $42 meal
    15·1 answer
  • If M&lt;1=3x + 15 and m&lt;2 = 6x + 3 , find x
    5·1 answer
  • Write the letters of the expressions that are equivalent to the given expression.
    10·1 answer
  • Please help I need it I’ll give Brainly please
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!