Answer:
Fastest to slowest = 6.08 > 6.4 > 6.72 > 6.75 > 7.03
Step-by-step explanation:
The person who completes the 50-meter race within the shortest possible time is the fastest sprinter. Here, the third sprinter crossed the line in 6.08 seconds, whereas the 4th sprinter crossed the line in 7.03 seconds. That is why the third sprinter has won the race, and he becomes the fastest. On the contrary, the fourth person takes the most time to complete the race, meaning he is the slowest.
If you are talking about finding the slope of BC then it looks like you have to find the square root of 3 which is approx 1.7 then find the slope.
slope equation is rise over run (or y over x): y1 + y2 divided by x1 + x2.
From this you should be able to find the answer
The length of the vegetable garden as a function of its length will be given as:
The expression of the garden width in terms of the width of the tomato patch is given as:
- Let the length of the garden be y
- Let the length of the tomato patch be x
If Melissa wants the length of the garden to exceed three times the length of the tomato patch by 2 feet, the length of the vegetable garden as a function of its length will be given as:
If she also wants the garden's width to <u>exceed the width of the tomato patch by 5 feet, t</u>he expression of the garden width in terms of the width of the tomato patch is given as:
<u />
Learn more on functions here: brainly.com/question/19999031
I'm assuming that the figure formed in this problem is a right angle. Thus, we need to use the Pythagorean theorem to get the distance or the hypotenuse.
Length = 20 meters
Height = 16 meters
a² + b² = c²
(20m)² + (16m)² = c²
400m² + 256m² = c²
656m² = c²
√656m² = √c²
25.61 m = c
The distance is 25.61 meters.
Answer:
135 new employees, 585 total employees
Step-by-step explanation:
Find 30% of 450.
(you can use any variables)
a = p*w
a = .30*450
a = 135
The company will hire 135 new employees, which would be (450 + 135) 585 total employees.
hope this helps :)