0.5 L/s = ml/h would be clearer if written as 0.5 L/sec = ml/hr.
Start with 0.5 L/sec:
0.5 L/sec 1000 ml 3600 sec
--------------- * ------------- * ---------------- = 1,000,000 ml/hr
1 1 L 1 hr
Answer:
15.86%
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
Percent of area between the mean and 0.20 standard deviations from the mean:
pvalue of Z = 0.2 subtracted by the pvalue of Z = -0.2
Z = 0.2 has a pvalue of 0.5793
Z = -0.2 has a pvalue of 0.4207
0.5793 - 0.4207 = 0.1586
So this percentage is 15.86%
You start with 100%, add 80% for the increase and you get 180%, take away 40% for the decrease and you get 140%
Assume that the total overhead variance is x
We are given that the total labor variance is twice the total overhead variance. This means that, the total labor variance is 2x
Total variance can be calculated as follows:
Total variance = Total materials variance + Total overhead variance
+ Total labor variance
We have:
Total variance = $35000
Total materials variance = $14000
Total overhead variance = x
Total labor variance = 2x
Substitute in the equation and solve for x as follows:
35000 = 14000 + x + 2x
35000 - 14000 = 3x
21000 = 3x
x = 21000/3
x = 7000
Based on the above calculations:
Total overhead variance = x = $7000
Total labor variance = 2x = 2*7000 = $14000
Answer:
420 hg = __4200000___ cg
Step-by-step explanation:
<h2>please mark me brainliest</h2>