1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
oksano4ka [1.4K]
3 years ago
8

Sound Tek Inc. manufactures electronic stereo equipment. The manufacturing process includes printed circuit (PC) board assembly,

final assembly, testing, and shipping. In the PC board assembly operation, a number of individuals are responsible for assembling electronic components into printed circuit boards. Each operator is responsible for soldering components according to a given set of instructions. Operators work on batches of 50 printed circuit boards. Each board requires 4 minutes of board assembly time. After each batch is completed, the operator moves the assembled boards to the final assembly area. This move takes 10 minutes to complete. The final assembly for each stereo unit requires 20 minutes and is also done in batches of 50 units. A batch of 50 stereos is moved into the test building, which is across the street. The move takes 20 minutes. Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 30 minutes. The units wait while the setup is performed. In the final test, the 50-unit batch is tested one at a time. Each test requires 8 minutes. The completed batch, after all testing, is sent to shipping for packaging and final shipment to customers. A complete batch of 50 units is sent from testing to shipping. The Shipping Department is located next to testing. Thus, there is no move time between these two operations. Packaging and labeling requires 12 minutes per unit.
1. Determine the amount of value-added and non-value-added lead time and the value-added ratio in this process for an average stereo unit in a batch of 45 units.
Value-added minutes
Non-value-added minutes 30 X min
Wait time minutes
Move time minutes min
Total non-value-added time min
Total lead time min
Value-added ratio (as a percent)
2. Move time in this process could best be reduced by:______.
A. Doing nothing.
B. Changing the layout from a process orientation to a product orientation.
C. Increasing batch sizes.
D. Eliminating the testing step.
E. Hiring more workers.
Business
1 answer:
Dmitry [639]3 years ago
3 0

Answer:

In the PC board assembly operation, assembling electronic components into printed circuit boards. As operators work on batches of 45 printed circuit boards. Each board requires 5 minutes of board assembly time.

Total time required = 5 min (value added)

moves the assembled boards to the final assembly area. This move takes 10 minutes to complete.

Total time required = 10 minutes (non value added – move time)

The final assembly for each stereo unit requires 15 minutes and is also done in batches of 45 units.

Total time required = 15 minutes (value added)

A batch of 45 stereos is moved into the test building, which is across the street. The move takes 20 minutes.

Time required = 20 minutes (non value added – move time)

Before conducting the test, the test equipment must be set up for the particular stereo model. The test setup requires 25 minutes.

Time required = 25 minutes (non value added – wait time)

In the final test, the 45-unit batch is tested one at a time. Each test requires 9 minutes.

Total time required = 9 minutes (value added)

shipping for packaging and final shipment to customers. A complete batch of 45 units is sent from testing to shipping. There is no move time between these two operations

Time required = 0 minutes

Packaging and labeling requires 10 minutes per unit.

Total time required = 10 minutes (value added)

Formula for Within-Batch Wait Time = (Total Time to Perform Operations) x (Batch Size – 1)

Calculation -

Value-added time required

PC board assembly =5 minutes

final assembly= 15 minutes

Testing = 9 minutes

Shipping = 10 minutes

Total Value-added time = 39 minutes

Non-value-added minutes:

Wait time (within – batch wait time) -

Wait time at PC board assembly = (45-1) *5 = 220 minutes

Wait time at final assembly= (45-1) *15 = 660 minutes

Wait time at Testing = (45-1) *9 = 396 minutes

Wait time at Shipping = (45 -1) *10 = 440 minutes

Total wait time within batch = 1,716 minutes

Set-up time = 25 minutes

Total wait time = 1,741 minutes

Move time minutes -

From assembled boards to the final assembly area = 10 minutes

From final assembly to test building = 20 minutes

Total Move time = 30 minutes

Total non-value-added time = wait time + move time = 1,741 + 30 = 1,771 min

Total lead time = value added + non value added = 39 min + 1771 min = 1,810 min

Value-added ratio (as a percent): Value added time / Total Lead time

= 39 / 1810 = 2.2%

You might be interested in
Problem 13-13 A mail-order house uses 18,000 boxes a year. Carrying costs are 60 cents per box a year, and ordering costs are $9
uranmaximum [27]

Answer:

A. 5,000 boxes per order

B. 3.6 orders per yr

Explanation:

See attached file

4 0
3 years ago
A company's Cash account shows an ending balance of $4,200. Reconciling items included a bookkeeper error of $50 (a $550 check r
hoa [83]

Answer:

Adjusted book balance will be $4258

Explanation:

We have given ending book balance = $4200

Error in recording = $50

Interest revenue = $33

And service charge = $25

We have to find the adjusted book balance

Adjusted book balance is given by

Adjusted book balance = Ending book balance + error in recording + interest revenue - service charge = $4200+$50+$33-$25=$4258

6 0
3 years ago
Magpie Corporation uses the total cost concept of product pricing. Below is the cost information for the production and sale of
skelet666 [1.2K]

Answer:

Correct answer is C. $ dollars.

Calculation:

Rate of Retun PU = (21%*605,000)/58,700 = 2.16

Fixed factory overhead PU = 38,500/58,700 = 0.66

Fixed selling and administration PU=  8000/58,700 = 0.14

Variable DM PU = 5.17

Variable Labour PU = 1.88

Variable FOH PU = 1.33

Variable selling and Admin PU  = 4.5

By adding all above mentioned per unit cost we get 15 dollars aprox

so

Correct answer is 15 dollar.

3 0
3 years ago
Bingerton industries began the year with inventory of$85,000. Purchases of inventory on account during the year totaled $310,000
Charra [1.4K]

The first entry of the journal records the inventory of of $310,000 as debited and accounts payable as credited.

<h3>What is inventory management?</h3>

The process of counting and recording fluctuations in the prices of assets such as raw materials, work-in-progress, and finished goods refers as Inventory management.

Following are the Journal entries-

1. Inventory accounts  A/c  $310,000

          To Accounts Payable A/c$310,000

 (Being the inventory is purchased)

2. Accounts Receivable   A/c  $520,000

           To Sales Revenue  A/c $520,000

   ( Being inventory is sold)

3. Cost of Goods Sold  A/c  $335,000

            To Inventory  A/c  $335,000

 (Being inventory is sold )

Learn more about Inventory, here:

brainly.com/question/26533444

#SPJ1

8 0
2 years ago
Suppose the demand function (D) for golf clubs is: Q = 240-1.00P, where P is the price paid by consumers in dollars per club and
bogdanovich [222]

Solution :

According to the theory of demand and supply, the equilibrium price and the quantity is established where both the demand and supply curves intersect.

From the graph, we can see that the point of equilibrium is at the intersection of D and S.

At this point, mathematically, D = S. In order to determine the price and quantity which exists at this point, we need to equate the demand as well as supply functions to calculate the equilibrium values.

∵ D is equal to S, we have

$240-1.00P=1.00P$

240=2P

120=P

Now substituting this value of the equilibrium price in to any of the functions, we get the equilibrium quantity at this price.

$Q=240-1.00P$

$Q=240-1.00(120)$

$Q=240-120$

$Q=120$

This is the equilibrium quantity. At this point, equilibrium price as well as the quantity is the same. Let the price of the golf club increases from $120 to $140. So substituting the value to the function above to determine the new quantity.

$Q = 240-1.00(140)$

   = 100

Therefore, when the demanded quantity decreases from 120 thousand clubs to 100 thousand clubs. This increases the price and decreases the quantity as the supply curve moved to the left. The demand remains constant.

4 0
3 years ago
Other questions:
  • Kluber, Inc. had net income of $900,000 based on variable costing. Beginning and ending inventories were 55,000 units and 52,000
    8·1 answer
  • Greg purchased 2,000 shares of common stock of the rite track corporation last year. he learned several months later that the st
    9·1 answer
  • On January 2, 2016, Alpha Company acquired a new machine by signing a 5 year note for $62,000. The estimated service life is eig
    9·1 answer
  • Which of the following are criteria for determining whether to record an asset as a fixed asset?
    5·1 answer
  • One of the best-reported predictors of college adjustment is:
    6·1 answer
  • Joseph is a sales manager for ETC Corporation. ETC is a manufacturer of high-end kitchen appliances for restaurants. Nicole has
    6·1 answer
  • An office management firm has developed a system for efficiently organizing small medical and dental practices both through prop
    14·1 answer
  • Is it ethical for one company to receive funds to move into an area when other companies struggle to keep jobs from going offsho
    15·1 answer
  • Jim Company bought a machine for $36,000 with an estimated life of 5 years. The residual value of the machine is $6,000. This ma
    13·1 answer
  • When comparison shopping, all of these hint at a good deal EXCEPT
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!