Answer:
$2,122,900
Explanation:
Calculation to determine what The Gross margin for September was
First step is to determine the variable costs
Variable costs= (317 * 7,100) + (44*7,100) + (22*7,100)
Variable costs= 2,250,700 + 312,400 + 156,200
Variable costs= $2,719,300
Now let determine the Gross margin
Using this formula
GM=Sales-VC
Let plug in the formula
Gross margin = (682 * 7,100) - 2,719,300
Gross margin = $2,122,900
Therefore The gross margin for September was:$2,122,900
<span>
Bachelors, Diploma and Higher Certificate Pass Requirements Explained
Written by howtopassmatric on October 20, 2015 <span> · 124 Comments</span> </span>
We often get asked to check if learner (Insert your name) will or will not pass with a bachelors, diploma or certificate.
Answer:
- Food service managers are facing a larger percent decrease at 3.31%
Explanation:
The percentage decrease in chefs/head cooks is:
= (100,600 - 99,800) / 100,600
= 0.795%
= 0.8%
Percentage decrease for food service managers is:
= (320,600 - 310,000) / 320,600
= 3.31%
Answer:
c) the mean, upper control limit, lower control limit and warning lines that are two sigma from the mean are indicated by horizontal lines in the control chart.
Explanation:
Walter Shewhart is regarded as an important personality in the history of quality management. He asserted that the behavior of real processes had the tendency to change as time changed and it was not the behaviur of theoretical random distributions.
Walter Shewhart posited that causes of variation could be divided into two which are chance cause and assignable cause. He maintained that chance causes could be ignored if they did not cause too much variation, and any attempt to eliminate them usually made the problem worse. He however posited that it was possible to fix assignable causes.
Walter Shewhart invented control chart in order to differentiate between variations caused by random events and trends that indicated assignable causes. There is time and a plot of sample measurements on the bottom axis of a control chart. The mean, upper control limit, lower control limit, and warning lines that are two sigma from the mean are indicated by horizontal lines.
Based on the above explanatio, the correct option is c) the mean, upper control limit, lower control limit and warning lines that are two sigma from the mean are indicated by horizontal lines in the control chart.
A small enterprise is one with smaller number of employees. It has a maximum number of employees that is 250 persons. It's annual balance sheet is said to no exceed 43 million euro. Hope this answers the question. Have a nice day.