1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Sergio [31]
2 years ago
5

2(2w - 6) + 2(w) = 3(w + 8)

Mathematics
1 answer:
borishaifa [10]2 years ago
3 0

Answer:

w=12

Step-by-step explanation:

4w-12+2w-3w-24=0

3w-36=0

3w=36

w=12

You might be interested in
Surface area of storage box that measures 15 centimeters by 12 centimeters by 10 centimeters?
stich3 [128]
1800----------------------
7 0
2 years ago
Read 2 more answers
PLEASE HELP, ITS TIMED SO HURRY PLEASE>>>>>>>
Olegator [25]

Answer:

The answer is noncollinear

Step-by-step explanation:

5 0
2 years ago
Read 2 more answers
A box of fruit has three times as many apples as oranges
luda_lava [24]
What is the question? i could help you if i knew the question
6 0
3 years ago
Is ( 0,0) a solution to this system? y<=x^2-4 y>2x-1?
Xelga [282]

Answer:

The point (0,0) is not a solution of the system of inequalities

Step-by-step explanation:

we have

y\leq x^{2} -4 -----> inequality A

y> 2x-1 -----> inequality B

we know that

If a ordered pair is a solution of the system of inequalities

then

the ordered pair must be satisfy the inequalities of the system

Verify

For x=0, y=0

substitute the value of x and the value of y in the inequalkity A and in the inequality B

Inequality A

0\leq 0^{2} -4

0\leq -4 -------> is not true

therefore

The point (0,0) is not a solution of the system of inequalities

3 0
3 years ago
Read 2 more answers
The owner of a construction company would like to know if his current work teams can build room additions quicker than the time
frez [133]

Answer:

The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.

Step-by-step explanation:

We have to test the hypothesis to prove the claim that the work team can build room additions quicker than the time allotted for by the contract.

The null hypothesis is that the real time used is equal to the contract time. The alternative hypothesis is that the real time is less thant the allotted for by the contract.

H_0: \mu=0\\\\H_1: \mu

The significance level, as a storng evidence is needed, is α=0.01.

The estimated standard deviation is:

s_M=\frac{s}{\sqrt{n}}=\frac{0.2}{\sqrt{16}} =0.2/4=0.05

As the standard deviation is estimated, we use the t-statistic with (n-1)=15 degrees of freedom.

For a significance level of 0.01, right-tailed test, the critical value of t is t=2.603.

Then, we calculate the t-value for this sample:

t=\frac{x-\mu}{s_M} =\frac{-0.32-0}{0.05}= -6.4

As the t-statistic lies in the rejection region, the null hypothesis is rejected. The claim that the current work teams can build room additions quicker than the time allotted for by the contract has strong statistical evidence.

8 0
3 years ago
Other questions:
  • Is 7.38 a mixed decimal
    15·2 answers
  • Determine the slope from the following two points:<br><br> (3,6) and (5, -2)
    12·1 answer
  • How would you change this to a radical form
    13·1 answer
  • How would you solve the following problem?
    12·1 answer
  • For the graph below, what should the domain be so that the function is at least 200?
    15·2 answers
  • Express the following in scientific notation:<br> .000457
    7·2 answers
  • Which of the following orderd pairs is a solution of x + 1/2 y = 1​
    5·1 answer
  • State the slope and the y-intercept of the graph x + y =5
    5·1 answer
  • Please guys answer to my question 24 30. 45 finding lcm​
    10·1 answer
  • The parabola opens:<br> O left<br> O up<br> O down<br> O right
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!