Answer:Half of its diameter.
Step-by-step explanation:
Answer:
It takes <u>8 4/7 </u>days for both bricklayers to build the wall together.
Step-by-step explanation:
The first bricklayer takes 15 days to build the wall, which means it builds 1/15 of the wall per day.
The second bricklayer takes 20 days to build the wall, which means it builds 1/20 of the wall per day.
So if they build the wall together, the expression below will tell how much of the wall they build per day together.
1/15 + 1/20
To add the fractions, we must find a common denominator, which is 60.
4/60 + 3/60, which equals 7/60.
So, they can build 7/60 of the wall per day together. How many days will it take them? We must find how many times 7 fits into 60, which can be done by solving 60/7, which is 8 4/7.
So, it takes 8 4/7 days for both bricklayers to build the wall together.
Ordered pairs are in the form (x, y). So, replace all variables with their values.
We have the ordered pair (0, 14). Replace x with its value and y with its value.
Now we have the inequality 14 > 0 + 12
Simplify the left-hand side.
14 > 0 + 12
14 > 12
So, the ordered pair (0, 14) is part of the solution set.
Since q+d=19, we can re-write this as d=19-q. Using the second equation 0.25q+0.1d=4 we can multiply both sides by 100. So we get 25q+10d=400. So now we can plug d=19-q into 25q+10d=400. So now we get, 25q+190-10q=400. Subtracting both sides by 190, we get 15q=210 and that q=14 plugging that in d=5
First, you divide the 2 yard spool into 5 equal lengths, or perform the operation 2/5.
After completing this, you get that each length of ribbon is 0.4 yards. But the question asks for it in feet. (There are 3 feet in a yard) Therefore, we must multiply the number of yards by 3, to find this number in feet.
0.4*3= 1.2
Therefore, the 5 equal lengths of ribbon measure 1.2 feet.