1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
lukranit [14]
3 years ago
11

If the area of a trapezoid is 234 square units what is the value of x

Mathematics
2 answers:
olganol [36]3 years ago
6 0
h=9
A=((a+b)/2)h
234=((32+20)/2)h
234=(52/2)h
234=26h
9=h

lara31 [8.8K]3 years ago
6 0

Answer:9




Step-by-step explanation:


You might be interested in
The probability that a worker with occupational exposure to dust contracts a lung disease is 0.2. three such workers are checked
Elena-2011 [213]

Answer:

i think b. at least one of them contracted a lung disease

5 0
3 years ago
In the movie drawer there are seven action movies, five comedies, and three dramas. What is the probability of choosing an actio
Julli [10]
2/15 is the possibility
5 0
3 years ago
What is the ratio of 3 1/2 inches to 4 2/3 feet in simplest form
Elden [556K]
3 1/2= 3.5 inches and 4 2/3 feet is 56 inches. Now put 3.5/56=0.0625
7 0
3 years ago
Read 2 more answers
The owner of two hotels is ordering towels. He bought 84 hand towels and 22 bath towels for his hotel in Milford, spending a tot
Dmitrij [34]

Step-by-step explanation:

hand towel is $5

bath towel is $9

7 0
3 years ago
Three machines operating independently, simultaneously, and at the same constant rate can fill a certain production order in 36
Andrews [41]

Answer:

D

Step-by-step explanation:

Let the total production order be X. The combined rate is thus x/36 orders per hour.

Now, we know that the three machines are working at the same constant rate. This means that individual rate for each of the machines will be x/36 divided by 3 and that gives x/108 per machine.

Now, we are having another machine coming at the same constant rate. This means we are adding an x/108 rate to the preexisting x/36.

The new total rate thus becomes x/108 + x/36 = 4x/108

Now we know that the total new rate is 4x/108. Since the total work doesn’t change and it is still x, the time taken to complete a work of x orders at a rate of 4x/108 order per hour would be x divided by 4x/108 and this is x * 108/4x = 108/4 = 27 hours

7 0
3 years ago
Other questions:
  • A truck is being filled with cube-shaped packages that have side lengths of 1/4 foot. The part of the truck that is being filled
    7·1 answer
  • write an equation to represent the relationship "a number decreased by negative 7 is the same thing as 48
    11·2 answers
  • Which measure of center would be BEST to use for the following set of data?
    14·2 answers
  • What is the most accurate representation of the area of a plot measuring 11.7 cm by 15.4 cm?
    6·1 answer
  • anonymous one year ago Andrew bought 3 baseball cards for $240. After a few months, he got an offer from his friend Jack to buy
    9·1 answer
  • When a figure rotates right, is that clockwise or<br> counterclockwise?
    7·2 answers
  • Find the area of a triangle. h= 8.2yards b= 2.1 yards​
    8·1 answer
  • What is the area of the rectangle that is 3/2 tall and 6/2 long<br> explain how you got your answer.
    7·1 answer
  • What's 9+10? Will give brainliest to whoever answers correctly.
    12·2 answers
  • Solve the following:​
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!