Answer:
(x-4)(x-3) hope this helps
Step-by-step explanation:
Answer:
and 
Step-by-step explanation:
If two equations are given, we can solve one of the equation in terms of single variable and put it in the other equation which will further give the value of x and y.
For the given equations:
Equation:1
Equation:2
Solving equation multiply equation 2 with 4 on both the sides
Equation 3
Subtracting Equation:3 from Equation:1

Putting value of 'y' in Equation:2 which will give the value of x

Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting

Length of each side of each of these three equilateral triangle is :
Solution is in attachment ~