Answer:
40% of the boys ate grapes :)
Thank you
Complete Question
Trade associations, such as the United Dairy Farmers Association, frequently conduct surveys to identify characteristics of their membership. If this organization conducted a survey to estimate the annual per-capital consumption of milk and wanted to be 95% confident that the estimate was no more than 0.5 gallon away from the actual average, what sample size is needed? Past data have indicated that the standard deviation of consumption of approximately 10 gallons.
Answer:
The sample size is 
Step-by-step explanation:
From the question we are told that
The margin of error is
The confidence level is
%
Given that the confidence level is 95% the level of significance is mathematically represented as

%

Next we obtain the critical value of
from the normal distribution table , the values is 
The reason we are obtaining critical values of

instead of

is because

represents the area under the normal curve where the confidence level interval (

) did not cover which include both the left and right tail while

is just the area of one tail which what we required to calculate the sample size
Now the sample size is mathematically represented as
![n = \frac{[Z_{\frac{\alpha }{2} }] ^2 * \sigma ^2}{MOE^2}](https://tex.z-dn.net/?f=n%20%20%3D%20%20%5Cfrac%7B%5BZ_%7B%5Cfrac%7B%5Calpha%20%7D%7B2%7D%20%7D%5D%20%5E2%20%2A%20%20%5Csigma%20%5E2%7D%7BMOE%5E2%7D)
substituting values


Answer:
17
Step-by-step explanation:
If BE=30 then you would have to find out what x is. 8+12=20 so all you need is 10 more to equal BE.
Answer:
The WIP limit is 0.50 days.
Step-by-step explanation:
The Computation of WIP limits:
to begin with, it is required to compute the process and procedure efficiency which will be computed as follows:
Value Added Time = 12 days (arriving time)
Non-Value-Added Time = 12 days (departure time)
Efficiency = Value Added / (Value Added + Non-Value Added)
= 12 / (12+12)
= 12 / 24
= 0.50 or 50%
the most obligatory throughput time will be 0.25 days to realize the profits
WIP limit = Throughput time / Efficiency
= 0.25 / 50%
= 0.50 days.
The WIP limit is 0.50 days.