This can be seen under Schedule management (Initiating)
Project float is simply the difference between the completion period externally imposed and the estimated time duration of the project (usually this is equal to the critical path length). The difference in this case is 0 because
Externally imposed project date = 75 days
Estimated duration of project = 75 days
Hence, a difference in these will be 0
However, a standard deviation of 3 days was giving (This implies that there is a +/- 3 days in the critical path from the estimated project duration)
.
Hence the maximum float in this case will be 0 + 3 = 3 days
The amount earned hourly by Ryan and the number of work hours required to cover his vacation cost are $29.75 and 63 hours respectively.
<u>Given the Parameters</u> :
- Total amount earned = $238
- Number of hours worked = 8 hours
Hourly earning = Total earning ÷ number of hours worked
Hourly earning = $238 ÷ 8 = $29.75
B.)
Vacation cost = $1850
Hourly earning = $29.75
<u>Number of work hours required</u> :
- Vacation cost ÷ Hourly earning
Therefore, Ryan will need to work for 63 hours to cover his vacation expenses.
Learn more : brainly.com/question/18796573
First, find a common denominator.
2 and 1/3 = 2 and 3/9.
4 and 2/9 - 2 and 3/9 = 1 and 8/9. Hope it helps!
Answer:
The top tree correctly represents the sample space
Step-by-step explanation:
At the "root" of our tree, we can either have three branches for each of the flavors, or two branches for each of the types of crust. Here's how each of those branches continue:
- If we start with the <em>three branches for flavors</em>, each branch will have <em>two more branches for the types of crust</em>. Working down the tree, I could start by choosing the pepperoni branch, and then continue to choose either thin or hand-tossed crust.
- If we start with the <em>two branches for crusts</em>, each branch will have <em>three more branches for the flavors</em>. This option is represented as the first tree in the image, and in this case would be the correct choice.
A) x ≈ 9.3 or x≈ -6.3
B) x ≈ 3.2 or x ≈ -4.7
C) x ≈ 6.4 or x ≈ -9.4
The answer is B