1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
IgorC [24]
3 years ago
14

This is the act, by a militarily strong country, of invading and taking over the sovereignty of another area. Many times by plac

ing a settlement or settlements of its own people to live in the new land.
Social Studies
2 answers:
meriva3 years ago
8 0

The answer is Colonization. Hope it helps Mate! :)

Harrizon [31]3 years ago
5 0

Answer:

the answer is colonization

Explanation:

You might be interested in
How did Aristotle’s idea of government differ from Plato’s?
alekssr [168]
Aristotle: Mixed government with rule by many.
Plato: Government with three different distinct groups.
6 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
A practical benefit of ________________is that it requires little in the way of resources which can be helpful for organizations
Temka [501]

A practical benefit of Content curation  is that it requires little in the way of resources

Explanation:

Content curation is the skill of assembling analogous, related topic and presenting it in an organized manner. It does not developing original content but collecting the related and relevant content from various resources and specifying in a sequential and well-designed that suits the taste and preferences of the online viewers.  

Videos, articles and website which we often book ark are types of content curation which we do without exactly knowing it in depth. Curated content differs drastically from content creation. Curation is gathering selective content to increase the search engine optimization and content creation is developing original content without any aspect of plagiarism in it.  

7 0
2 years ago
How many people attend mardi gras in new orleans?
Roman55 [17]

Estimates show that about 1.2 - 1.4 Million people attend Mardi Gras in New Orleans, Louisiana, USA.

Mardi Gras, Fat Tuesday, is a carnival-style celebration with feasting, parades, and masquerade balls. The holiday is of French Catholic origin. The celebration is in honor of the upcoming fasting and Lent season.

4 0
2 years ago
After the French and Indian war, a conflict between American colonies and British colonies and the British government developed.
Karo-lina-s [1.5K]

Answer: Because the Americans just tough a war to gain the French land and after they won they weren’t allowed to use what they just fought for.

Explanation:

5 0
3 years ago
Other questions:
  • What is genocide? I need a log answer.​
    5·1 answer
  • As mayor of Atlanta, what program would Jackson want to promote the most?
    13·1 answer
  • What happens during a pilgrimage?
    8·2 answers
  • Which of the following is a similarity between the inclusive model and the traditional model of diversity? a.Both include aspect
    15·1 answer
  • The FBI has an open criminal investigation regarding potential terrorist activities in the U.S. The agency wants to gain access
    5·1 answer
  • The primary purpose of the Marshall Plan was to
    13·1 answer
  • ABCD?
    10·1 answer
  • Definition of cultism​
    12·2 answers
  • The study of rule-making and rule-enforcements was/is the major focus of interactionist and __________ theorists
    11·1 answer
  • If your engine stalls, what is the first thing you should do? open your hood. use the emergency brake to brake slowly. shift the
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!