the answer of the question is tens
The first thing you must do is to calculate the weight of the gravel (w) that the truck holds (7.5 yards³). So, you have:
If the weight of 1 yard³ is 1.48 tons, then the weight of 7.5 yards³ is:
w=7.5x1.48 tons
w=11.1 tons
The problem says that the gravel will be placed in containers that each hold 3.7 tons of gravel,so, If they need 1 cotainer to place 3.7 tons, how many containers they need to place 11.1 tons?
1 container-------3.7 tons of gravel
x-------11.1 tons of gravel
x=(11.1x1)/3.7
x=11.1/3.7
x=3 containers
H<span>ow many containers of this size are needed to hold all the gravel from one truck?
</span>
The answer is: 3 containers.
This line y = 4/5 x - 3 has slope = 4/5
Perpendicular lines, slope is opposite and reciprocal so slope of a line that is perpendicular to the line y = 4/5 x - 3 is -5/4
Answer
- 5/4
Answer:
The slope is -2/3.
Step-by-step explanation
Let m represent the slope.
m= rise/run= y2-y1/x2-x1
-1 - (-3)/0-3
2/-3
-2/3
Answer:
$10
Step-by-step explanation:
x is her weekly allowance.
She spent half her allowance and has ½x remaining.
She earned $7, and now has $12.
12 = ½x+7
x = 10