Answer:To make 5 batches, Jude needs to use 20 packages of pre-mixed mortar.
Jude uses 9 quarts of water to make 3 batches of cement
If jude uses 16 packages of pre-mixed mortar, he will need to use 12 quarts of water
To make 0.5 batch of cement , Jude should use 2 packages of pre-mixed mortar
Step-by-step explanation:
Here's the equation for one year:
0.03(8000) + 8000
For four years:
4(0.03(8000)) + 8000
0.12(8000) + 8000
To make it simpler/smaller:
1.12(8000) = 8960
You can make 960 more dollars, and you now have $8960
Check the picture below.
let's recall that the midsegment of a triangle is the segment that's half-way to both endsides and is at the same time parallel to the 3rd side, is also half the length of the parallel side, so-called the base.
so, for example, we know L, M and N are midpoints to each segment, that means that LM is a midsegment and parallel to PR and also half the length of PR, same is true for LN and MN.
Answer:
elflaerkhg/lndfklnds/lfknas.dgsnf.raekjhg.re;ihnvdltnh45
Step-by-step explanation:
yeah <3