You need to find the hypotenuse of the right triangle.
4² + 9² = c²
16 + 81 = c²
97 = c²
9.85 = c
There are 5,280 ft in a mile.
Multiply 9.85 by 5,280.
9.85 × 5,280 = 52,008
Multiply 52,008 by 110.
52,008 × 110 = <span>5,720,880
The estimated cost for constructing the street would be $</span>5,720,880.
Answer:
The probability that a customer pays late each month is P(B) = 0.27
Step-by-step explanation:
Let P( A ) be the probability that the customer pays on time and the value is 0.55
Let P( B ) be the probability that a customer pays late each month
So
The probability that a customer pays late or on-time each month is P(A u B) and the value is 0.82
The probability that a customer pays on-time and late each month is P(A n B) and the value is zero ( 0 ) given that it is impossible
Now The probability that a customer pays late or on-time each month is mathematically represented as
P(A u B) = P(A) + P(B) - P(A n B)
=> 0.82 = 0.55 + P( B ) - 0
=> P(B) = 0.27
Answer:
Arlin has to give lauren 1.37
Step-by-step explanation:
9.37 + 6.63 / 2 = 16 / 2 = 8
9.37 - 8 = 1.37
Answer:
22 + x ≤ 40
x ≤ 18 pounds
Step-by-step explanation:
Maximum weight = 40 pounds
Initial weight = 22 pounds
Let Maximum weight that can be added = x
Mathematically, this means :
Initial weight + additional weight ≤ 40
That is ;
22 + x ≤ 40
Additional weight, x :
x ≤ 40 - 22
x ≤ 18 pounds