We have that
y=x²----> equation 1<span>
y=x+2-----> equation 2
multiply equation 1 by -1
-y=-x</span>²
add equation 1 and equation 2
-y=-x²
y=x+2
------------
0=-x²+x+2-------------> -x²+x+2=0-----> x²-x-2=0
Group terms that contain the same variable, and move the
constant to the opposite side of the equation
(x²-x)=2
<span>Complete
the square. Remember to balance the equation by adding the same constants
to each side
</span>(x²-x+0.5²)=2+0.5²
Rewrite as perfect squares
(x-0.5)²=2+0.5²
(x-0.5)²=2.25-----> (x-0.5)=(+/-)√2.25-----> (x-0.5)=(+/-)1.5
x1=1.5+0.5-----> x1=2
x2=-1.5+0.5---- > x2=-1
for x=2
y=x²----> y=2²----> y=4
the point is (2,4)
for x=-1
y=x²----> y=(-1)²---> y=1
the point is (-1,1)
the answer isthe solution of the system are the points(2,4) and (-1,1)
So the angles combined should be 360 and we already know h is 90 degrees. so the rest should equal 270. Just set up an equation of:
9x + 14x + 4x = 270
then solve for x, first combine like terms
27x = 270
then get x alone by dividing
x = 10
then plug 10 into the problem next to angle f: 14x
14 * 10 = 140
Answer:
7 minutes
Step-by-step explanation:
average time = 6 minutes per mile
sum = average * count = 6 minutes / mile * 4 miles = 24 minutes
first + last mile = 5 + 5 = 10 minutes
first + second + third + last mile = sum = 24 minutes
second + third = sum - first - last = 24 - 5 - 5 = 24 - 10 = 14 minutes
average of 2 miles in the middle = sum / count = 14 minutes / 2 = 7 minutes
The expression for each salary plan if s is Fernando's total weekly sales, would be:
Expression A: S= 100+ 100(0.15y) y=Commission
Expression B: S= 150+ 150(0.10y)
What amount of weekly sales us plan B better than plan A, the answer would be:Plug in the numbers for Y and use the outcomes as the sales stay to increase. For example, start with 5 sales, then go to 10 then 15, and so on and so forth.