1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
bezimeni [28]
2 years ago
14

Factorization of nine using exponents from least to greatest

Mathematics
1 answer:
natta225 [31]2 years ago
4 0

The only way to write 42 as the product of primes (except to change the order of the factors) is 2 × 3 × 7. We call 2 × 3 × 7 the prime factorization of 42. It turns out that every counting number (natural number) has a unique prime factorization, different from any other counting number. This fact is called the Fundamental Theorem of Arithmetic. Fundamental theorem of arithmetic

In order to maintain this property of unique prime factorizations, it is necessary that the number one, 1, be categorized as neither prime nor composite. Otherwise a prime factorization could have any number of factors of 1, and the factorization would no longer be unique.

Prime factorizations can help us with divisibility, simplifying fractions, and finding common denominators for fractions.

You might be interested in
What is 2x6+14+15+27-2
Andrews [41]
Use a calculator kkkkk
5 0
3 years ago
Read 2 more answers
WILL GIVE BRAINLIEST ANSWER !! NEED HELP QUICK !!
k0ka [10]

Answer:

its letter A

Step-by-step explanation:

8 0
2 years ago
Who created Sports Illustrated?
IRISSAK [1]

Answer:

henry lucr did

please brainlist

8 0
3 years ago
Read 2 more answers
Factorize: x² + 3x + 2​
zvonat [6]

Step-by-step explanation:

x² + 3x + 2

x² + x + 2x + 2 because 1+2=3 and 2×1=2

By taking out common terms, we get

x(x+1)+2(x+1)

(x+1)(x+2)

7 0
3 years ago
A can do a piece of work in 4 hours and B can do it in 6 hours. How much time would they take working together to finish the wor
Kipish [7]

Answer:

2.4 hours

Step-by-step explanation:

Let total work = X

Rate of work done = X ÷ time

Rate of A = X/4

Rate of B = X/6

If they work together, rate is the sum of their individual rates, i.e.

X/4 + X/6

= (3X + 2X)/12 (taking LCM)

=5X/12

Rate = X/time

5X/12 = X/time

time = X÷(5X/12)

time = X × 12/(5X)

time = 2.4 hours

Shortcut:

Product of individual times/sum of individual times

= (4×6)/(4+6)

=24/10

=2.4 hours

8 0
3 years ago
Read 2 more answers
Other questions:
  • What does the value in front of x represents?
    8·1 answer
  • How many horizontal units are between the points (-2,8) and (7,8) on a coordinate plane?
    9·1 answer
  • Polygon ABCD is translated to create polygon A'B'CD'. Point A is located at(1,
    14·2 answers
  • Cory made 4500 g of candy. He saved 1 kg to eat later. He divided the rest of the candy over 7 bowls to serve at his party.
    8·2 answers
  • What is the area of a kite with diagonals 8m and 11.5m????
    14·1 answer
  • Solve the inequality. <br><br>A. x ≤ -3<br><br>B. x ≥ -3<br><br>C. x ≤ 3<br><br>D. x ≥ 3
    6·1 answer
  • Solve the given initial-value problem.
    5·1 answer
  • Subtract. (2 + 5i) – (4 – 2i)
    14·2 answers
  • Find the exact solution to the equation.<br> 4(12-3x) = 64<br><br> What is the solution?
    10·1 answer
  • I need help! Does anyone understand?
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!