Answer:
The correct option is C....
Step-by-step explanation:
First of all multiply the terms:
(x-6)(x+8)=0
x^2+8x-6x-48=0
Now solve the like terms:
x^2+2x-48=0
Now we will solve this quadratic equation by factoring:
The first terms has coefficient 1. So 1 will be multiplied by the constant term 48.
1*48= 48
Now we have to find out the two values whose product is 48 and whose sum or difference is 2(middle term).
8*6 = 48
8-6 = 2
Now break the middle term:
x^2+8x-6x-48 = 0
Now take the common from the first two and last two terms:
x(x+8)-6(x+8) = 0
(x+8)(x-6)=0
x+8=0 , x-6=0
x= 0-8 , x=0+6
x = -8 , x=6
Thus the solutions we get are: x=6 or x= -8
The correct option is C....
3/30
You have to divide so the answer is 0.1=
10%
Answer:
The cost of a sheet metal per square foot is $30
Step-by-step explanation:
Given
Size of Sheet Metal = 8.2ft squared
Used Sheet Metal = 3.5ft squared
Worth of leftover sheet = $141
Equation: 
Required
Find the cost per square foot of the sheet metal
Solving for x in the above equation will give the cost per square foot of the sheet metal.


Divide both sides by 4.7



Hence, the cost of a sheet metal per square foot is $30
X and Y both represent the position on a graph. So, to find the X- or Y- intercepts, simply set the other value to zero. (After all, the x-intercept is when y is zero, and vice versa.)
So for X...
2/3x-1/3(0)=2
2/3x=2
/(2/3)
x=3
So the X-intercept is at (3,0).
Now, the y-intercept.
2/3(0)-1/3y=2
-1/3y=2
/(-1/3)
y=-6
So the Y-intercept is at (0,-6).