Answer:
the portfolio's return will be Ep(r)= 9.2 %
Explanation:
if the stock lies on the security market line , then the expected return will be
Ep(r) = rf + β*( E(M)- rf)
where
Ep(r) = expected return of the portfolio
rf= risk free return
E(M) = expected return of the market
β = portfolio's beta
then
Ep(r) = rf + β*( E(M)- rf)
E(M) = (Ep(r) - rf ) / β + rf
replacing values
E(M) = (Ep(r) - rf ) / β + rf
E(M) = ( 17.2% - 3.2%) /1.4 + 3.2% = 13.2%
since the stock and the risk free asset belongs to the security market line , a combination of both will also lie in this line, then the previous equation of expected return also applies.
Thus for a portfolio of β=0.6
Ep(r) = rf + β*( E(M)- rf) = 3.2% + 0.6*(13.2%-3.2%) = 9.2 %
Ep(r)= 9.2 %
Answer:
The correct answer is d. Different economic models employ different sets of assumptions.
Explanation:
To approach the study of economic reality it is necessary, in some way, to simplify it; keep certain variables under control. Precisely for this, it is that economic models are built.
Economic models are built on principles of departure, called "assumptions." Such assumptions fulfill the same role as the postulates in geometry. That is:
- They are not subject to deduction from other more basic principles.
- They are "reasonably" true but not necessarily verifiable.
- They function as premises in the logical structure to deduce the conclusions and correlations found in the lowest levels of generality.
We can say then, that the theoretical explanations refer to invisible "relationships", whose existence is proposed by the theory, and whose implications are logically deduced, and then corroborated by observations. They consist of:
- Assumptions (eg subjects want to maximize their earnings).
- Relevant variables (eg price and quantity).
- Binding hypothesis (eg quantity demanded based on price).
- Conclusions or predictions of observable facts (eg prices will rise).
Answer:$4,500---B, ie the 2nd option
Explanation:
From April to December we have 9 months
Interest Expense is given as Loan x Interest Rate x duration
Interest Expense = 50000 x 12% x 9/12 =
50,000x 0.12x9/12= $4,500