Answer:
The answer is the last choice that is "None of these values will produce a mathematical error".
Explanation:
In this question, the above given choice correct because neither of the flowchart procedures could trigger a mathematical error. This error could not be induced by multiplication, addition and subtraction, and the only division by 15. It is the only divide by 0, that's why the above flowchart will produce a mathematical error.
page layout...... im not sure
Answer:
Check the explanation
Explanation:
When there are situations of obviously misspelled queries, you will have to base the Needs Met rating on the user intent
The reason is that, even when query is misspelled it won’t mean that it is less important. Therefore, the queries should be assigned degree of rating based on the respective priority.
The answer would be 13.3125 because 6.25 / 0.8 is 7.8125 than add 5.5 which will equal 13.3125. I'm sure about this.