Answer:
Unitary cost= $56
Explanation:
Giving the following information:
Variable manufacturing overhead $15
Direct materials $13
Direct labor $17
Fixed manufacturing overhead $12
Fixed marketing and administrative $11
Under absorption costing, the fixed overhead is allocated to the product cost:
Unitary cost= direct material + direct labor + variable overhead + fixed overhead
Unitary cost= 13 + 17 + 15 + 11= $56
Answer:
60,000,000
Explanation:
Dye trucking raised $85 million to buy stock
After the recap Dye's stock price is $8.50
Dye share had 70 million share before the recap
Therefore the number of shares present after the recap can be calculated as follows
= 70,000,000-(85,000,000/8.50)
= 70,000,000-10,000,000
= 60,000,000
Hence the number of shares after the recap is 60,000,000
Answer: The amount of gross margin Mazer would report if the company uses absorption costing is $1350.
Explanation:
Given that,
Mazer Manufacturing Company produced = 2,000 units of inventory
Units Sold = 1,800 units
Variable product cost = $4 per unit
Fixed manufacturing overhead cost = $2,500
Sales price of the products = $6 per unit
Fixed manufacturing cost per unit = 
= 
= $1.25 per unit
Unit Product cost under Absorption costing = Variable product cost + Fixed manufacturing cost per unit
= 4 + 1.25
= $5.25
∴ Gross margin under Absorption costing = Sales Revenue - Cost of goods sold
= Units sold × sales price - Units sold × Unit Product cost under Absorption costing
= 1800 × 6 - 1800 × 5.25
= 10800 - 9450
= $1350
Answer:mission and vision of the garage
Explanation: Mission — Provide excellent, on time service at a reasonable price Strategy — keep cost down by employing only the people you need Order parts when needed Advertise for business through word of mouth, fends, and referrals. 1- Goods and services design — prices are set on a per hour shop labour basis determined by a preset formula 2- Quality — certification is required to be employed at the shop Poor labour could negatively impact the reputation of the business 3- Process and capacity design — Business is laid out for the day by the shop manager, and done so on a per job basis Those jobs taking the longest will be started earliest in the morning 4- Location selection — The shop was chosen in a pre-existing building, on a busy street with lots of passing traffic for high exposure 5- Layout design — The layout of the work area is designed for easy access to tools and other necessity.