Suppose you are a project manager who typically has been using a waterfall development-based methodology on a large and complex

project. Your manager has just read the latest article in Computerworld that advocates replacing this methodology with the Unified Process and comes to you requesting you to switch. What do you say?
Computers and Technology
1 answer:
Schach [20]4 years ago
7 0

Answer:

Answer explained below

Explanation:

Depending upon the current situation we can switch. That means suppose the entire project is mid way that means we already implemented the project by Waterfall methodology then it would take lot of time to switch to Prototype model. Again if we see the efficiency I mean if we complete the project using prototype model and the outcome would be very well and robust then we should definitely switch to prototype model. So depending on the scenario we need to decide whether it would be beneficial to switch or not.

Further, we have the differences between Waterfall and Prototype :

I) In case of Waterfall model requirements should be very well known. On the other hand in case of prototype model if the user requirements are not complete then we can choose prototype model.

II) Technical issues should be cleared in case of Waterfall model, on the other hand technical requirements need not be clear.

Advantages of Waterfall:

I) Easy to understand this model and easy to use.

II) It provides structure to inexperienced staff

III) Milestones are well understood

IV) Set requirements stability

Disadvantages of Waterfall Model:

I) All requirements must be known upfront

II) Inhibits flexibility

III) Can give a false impression of progree

Advantage of Prototype Model:

I) Even if user requirements are not complete we can use

II) Even if technical issues are not clear we can use

Disadvantage of Prototype:

I) The Model is complex

II) Risk Assessment expertise is required

III)Time spent for evaluating risks too large for small projects.

You might be interested in
Drag the tiles to the correct boxes to complete the pairs.
-BARSIC- [3]

1) ECPA is D. Prohibits the government and law enforcement agencies from acquiring information about an individual through telephonic or digital media.

2) COPPA is C. Restricts websites from acquiring information from users below the age of thirteen.

3) OPPA is A. Directs company websites to declare their privacy policies and their expiration dates on their websites if the users are from California.

4) FCRA is B. Regulates credit ratings and how agencies view an individual's credit information.

8 0
3 years ago
Read 2 more answers
Which best describes the purpose of LoJack on a computer
iris [78.8K]

Answer:The purpose of the lo jack on a computer  to the lock and delete files on the computer devices.

Explanation:The lo jack on a computer to locate all the lock and delete files.

lo jack can provides the computer on the passwords that contains different levels of the bios access.

lo jack perform on the computer operating system provides on the boot only the trusted by the computer operating system.

Lo jack computer on the function is used to the published  the exam answers on the websites.

Lo jack insures to the data into hard drives to the correct computer password.

3 0
3 years ago
Algorithm to find volume of cuboid​
Dovator [93]

Answer:

Volume of a Cuboid = Length * Breadth * Height.

Volume of a Cuboid = lbh.

The Lateral Surface Area of a Cuboid = 2h (l + w)

Explanation:

6 0
3 years ago
What is the name for the type of flash memory that is used by mobile devices to store their apps and data?
tankabanditka [31]
D. Solid state is correct
5 0
3 years ago
Who completes the action item form in a team meeting
____ [38]

Answer:

Recorder

Hope this helped! I'm not 100% if this answer is correct, though

3 0
2 years ago
Other questions:
  • Obtain the 10’s complement of the following six-digit decimal numbers:<br><br> 123900<br><br> 980657
    10·1 answer
  • True/False: If a function is legally prototyped to return an integer value, it can return a structure member that is an integer
    11·1 answer
  • What is the purpose of the backoff on Ethernet networks?
    5·1 answer
  • On the piano, the pitches/notes used on the bass clef are located on what part of the keyboard?
    9·2 answers
  • Will a large computer monitor have a clearer picture than using my plasma tv screen?
    9·1 answer
  • Dora has inserted a text box into a Word document that she is formatting. Which strategy will not format text boxes? Create a li
    6·2 answers
  • In which step of web design is storyboarding helpful?
    10·1 answer
  • As a basic user of SAP Business One, which feature of the application do you like most? Elaborate on your answer.
    15·1 answer
  • What is malware? a type of virus that spreads through a network connection a type of virus that targets programs and files any p
    8·1 answer
  • Does any one know how to do addition of binary numbers​
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!