For concreatting a tower cement, sand, stones are in the ratio 1:2:4 For 144kg sand.. What amount of cement is required?
We are given the ratio
cement: sand:stones
= 1:2:4
The sum of proportion =
1 + 2 + 4 = 7
We are given the kg of sand = 144kg
Step 1
We find the total kg of cement, sand and stones = x
Using the proportion of sand,
2/7 of x = 144kg
2/7 × x = 144kg
2x/7 = 144kg
Cross Multiply
2x = 7 × 144kg
x = 7 × 144kg/2
x = 504kg
Therefore the total kg of cement, sand and stone = 504kg
Step 2
The amount of cement required is calculated as:
1/7 × 504 kg = 72 kg
Therefore, 72kg of cement is required.
1.23 is the correct answer
Answer: $ 10,988.25
Step-by-step explanation:
Hi, to answer this question, first we have to multiply the original number of students scheduled to go to the trip (420) by the added students’ percentage (15%) in decimal form (divided by 100)
420 x (15/100) = 420 x 0.15 = 63 students added
Adding the number of extra students to the original number:
420+63 = 483 students (total number of students)
Finally, we have to multiply the result by the cost of each admission ticket (22.75)
483 x 22.75 = $ 10,988.25