Answer:
W = 15900 ft.lb
Step-by-step explanation:
From the given information.
Consider y to be the distance from the ground towards the bucket of the cement.
At height y, suppose the bucket is lifted by Δy.
Then, the workdone can be = 500Δy + 0.5(75 - y) Δy
where;
The bucket of the cement = 500Δy
The remaining of the rope = 0.5(75 - y) Δy
However; the workdone (W) can be calculated as:


W = 15000 + 0.5 ( 2250 - 450)
W = 15000 + 900
W = 15900 ft.lb
Answer:
Step-by-step explanation:
1. the solution is the fourth one
2. the solution is the first one
Answer:
10
Step-by-step explanation:
Let's take this variable by variable. z to the power of 4 over z to the power of one would equal z to the power of 3. At this point, there is no longer a z variable in the denominator.
X to the power of 2 over x to the power of 1 would equal x. At this point there is also no x variable in the denominator.
Y to the power of 1 over y to the power of 2 would equal (1/y). At this point, there is no y in the NUMERATOR.
Final Answer: