1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
tresset_1 [31]
3 years ago
15

Explain the differences between the earliest linear models of communication as action and the later interactive and transactive

models.
Social Studies
1 answer:
gtnhenbr [62]3 years ago
4 0

the three models of communication: linear, interactive, and transactional. Interactive- basically the same as linear, except the interactive model of communication includes feedback. Introduction of feedback indicates that communication is a two-way progress.

You might be interested in
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
Many clinicians suggest that the most difficult part of treatment for anorexia nervosa, and the part of treatment where many ano
gulaghasi [49]
The correct answer is <span>changing their attitudes regarding body and self image. 
The clinicians can easily fix what's on the outside, but fixing a person's brain and thoughts is not such an easy job. It is important for people suffering from anorexia nervosa to understand that their body is beautiful and that they shouldn't starve themselves to death in order to change that.
</span>
6 0
3 years ago
In two or more complete sentences, describe the five step process of fractional distillation that is used to refine crude oil.
Vesnalui [34]

Fractional distillation

heated crude oil enters a tall fractionating column , which is hot at the bottom and gets cooler towards the top. vapours from the oil rise through the column. vapours condense when they become cool enough.

4 0
3 years ago
Discuss one consequence of the social problems on the individual​
dexar [7]

Answer:

its

Explanation:

i did it

5 0
3 years ago
Read 2 more answers
How long was the shay's rebellion around
Andru [333]

Answer:

6 month

Explanation:

A group of protestors, led by Revolutionary War veteran Daniel Shays, began a 6 month rebellion by taking over the Court of Common Pleas in Northampton; the goal was to prevent the trial and imprisonment of debt-ridden citizens.

6 0
3 years ago
Other questions:
  • Work activities are most likely to foster happiness when they promote
    15·1 answer
  • PLZ HELP... How do you balance a budget.. plz NO answers from other website, or i will report
    14·1 answer
  • I need help with this question please help quick!!!
    5·1 answer
  • Which of the following people is NOT an example of a dictator?
    15·2 answers
  • Based on what the story of the mosinth
    15·1 answer
  • How did nationalism change Italian and German states
    5·1 answer
  • Which statement is true regarding the colonists prior to the American Revolution
    14·1 answer
  • How did other countries in the world<br> help to pressure South Africa into<br> nding apartheid?
    12·1 answer
  • Ecological theory has been criticized for paying too little attention to
    14·1 answer
  • Please help..........​
    8·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!