Hitman42 [59]
3 years ago
6

Solve: 4(2x - 1) - 3 = 9(x - 4) -29 32 13 29

Mathematics
1 answer:
kari74 [83]3 years ago
5 0
4(2x - 1) = 9(x - 4)
8x - 4 = 9x - 36
x = 32

i am a mathematics teacher. if anything to ask please pm me
You might be interested in
25POINTS!!!
irina [24]

Answer:

10.8 cm

Step-by-step explanation:

Using cosine law

g² = 7.1² + 6.7² - 2(7.1)(6.7)cos(103)

g² = 116.7018433

g = 10.80286274

5 0
3 years ago
One factor of 32 is
Elodia [21]
Ik you asked for one but here's a couple: 1,2,4,8,16,32
4 0
3 years ago
Read 2 more answers
1
lbvjy [14]
The answer of the question is min-jun ran 112 because 14 x 8 4 times 8 equals 32 carry ya 3 1 time 8 equals 8 plus 3 equals 11 so the answer is 112
6 0
2 years ago
Problem 11-93 Waltner Corporation s management... Waltner Corporation's management reports that its average delivery cycle time
Marat540 [252]

Complete question is;

Waltner Corporation's management reports that its average delivery cycle time is 25 days, its average throughput time is 7.7 days, its manufacturing cycle efficiency (MCE) is 0.43, its average move time is 0.3 day, and its average queue time is 3.00 days. Required: a. What is the wait time?

b. What is the process time?

c. What is the inspection time?

Answer:

A) Wait time = 17.3 days

B) Process time = 3.311 days

C) Inspection time = 0.789 days

Step-by-step explanation:

A) we are given;

Delivery cycle time = 25 days

throughput time = 7.7 days

The formula for wait time is calculated from;

Delivery time = wait time + throughput time

So, wait time = Delivery time - throughput time

Wait time = 25 - 7.7 = 17.3 days

B) The process time is calculated from;

MCE = Process time/throughput time

So, process time = MCE x throughput time

We are given MCE = 0.43,thus, and we already know throughput time. Thus;

Process time = 0.43 x 7.7 = 3.311 days

C) The inspection time is gotten from;

throughput time = Process time + Inspection time + Move time + Queue time

Making inspection time the subject;

inspection time = throughput time - Process time - Move time - Queue time

Move time = 0.3 days

Queue time = 3 days.

Thus;

inspection time = 7.7 - 3.311 - 0.3 - 3.3 = 0.789 days

3 0
3 years ago
10 + 2n = 8n - 2n + 10
galina1969 [7]

Answer:

n=0

Step-by-step explanation:

Rearrange

10+2=8−2+10

2+10=8−2+10

Combine like terms

2n+10=<u>8n−2n</u>+10

2+10=<u>6</u>+10

Subtract from both sides

2+10=6+10

2+10<u>−10=</u>6+10<u>−10</u>

Simplify

2n=6n

Subtract both sides from 6n of the equation

2=6

2<u>−6</u>=6<u>−6</u>

Solution

n=0

5 0
3 years ago
Other questions:
  • To compare 29/60 and 45/88 this time comparing both fraction with 1/2
    7·1 answer
  • The table below shows a correct representation that 15 pounds (lb) of sugar cost $3:
    9·1 answer
  • Explain how you know whether to add or subtract when you use the Distributive property to multiply
    12·2 answers
  • Identify which is a hypothesis or a conclusion. A polygon is a rectangle. The polygon has four congruent angles
    11·1 answer
  • What is the factored form of k² + kf – 2f²?
    13·2 answers
  • Decide whether to reject h 0 for the level of significance ΅ . right - tailed test z = 1.43 ΅ = 0.05 22) the p - value for a hyp
    11·1 answer
  • Does this table represent a function? Why or why not?
    5·1 answer
  • 2 angles are complementary. One of the angles is 30 degrees. The other has a label of 5n + 20. What would "n" have to be?
    5·1 answer
  • In the following equation, what number represents the slope?
    11·2 answers
  • Amy drives 300 miles from London to Newcastle.
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!