Computing the rate we get:
Then, when the assembly line runs at the same rate for 24 hours they will produce:
Answer: Option C) 720.
<span>The difference between constructing and drawing geometric figures:
</span>Drawing Geometric Figures refers to drafting, in which you are trying to create or sketch geometric figures using ruler, paper, etc.
While constructing geometric figure refers to constructing or building a geometric figure with the use of compass, graph paper, etc.
<span>A high school baseball team averaged 800 fans for each of its seven home games. What is the order of magnitude of the total attendance?
The answer is B. 3</span>
Answer:
7) 8.94
8) 6.71
Step-by-step explanation:
for both questions, use pythagorean theorem
<u>Question 7:</u>
16 + 64 =
80 =
c = 8.94
<u>Question 8:</u>
36 + 9 =
45 =
c = 6.71