To get an answer which is....45
Answer:
C. $97
Step-by-step explanation:
The average of his wage for all 15 days is the sum of all wages for the 15 days divided by 15.
average wage for 15 days = (sum of wages for the 15 days)/15
The amount of wages during a number of days is the product of the average wage of those days and the number of days.
First 7 days:
average wage: $87
number of days: 7
total wages in first 7 days = 7 * $87/day = $609
Last 7 days:
average wage: $92
number of days: 7
total wages in last 7 days = 7 * $92/day = $644
8th day:
wages of the 8th day is unknown, so we let x = wages of the 8th day
total wages of 15 days = (wages of first 7 days) + (wages of 8th day) + (wages of last 7 days)
total wages of 15 days = 609 + x + 644 = x + 1253
average wage for 15 days = (sum of wages for the 15 days)/15
average wage for 15 days = (x + 1253)/15
We are told the average for the 15 days is $90/day.
(x + 1253)/15 = 90
Multiply both sides by 15.
x + 1253 = 1350
Subtract 1253 from both sides.
x = 97
Answer: $97
Answer:
That would be 2 pints!1!1!
Step-by-step explanation:
Answer:
1590.4 square ft
Step-by-step explanation:
r=30 so you need to multiply that by 25% (30*.25=7.5)
30-7.5=22.5
A= pi(r)^2
A=pi*(22.5)^2
A=506.25pi
A=1590.43 or 1590.4 (to the nearest tenth)